Certbus >Cisco>CCNP>300-620
300-620 Dumps

  Printable PDF

Cisco 300-620 dumps - 100% Pass Guarantee!

Rating: 5.0

Vendor: Cisco

Certifications: CCNP

Exam Name: Implementing Cisco Application Centric Infrastructure (DCACI)

Exam Code: 300-620

Total Questions: 244 Q&As

Last Updated: Nov 23, 2023

Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $45.99 VCE Only: $49.99 VCE + PDF: $59.99

Cisco 300-620 PDF&VCE Dumps Download

  • 99.5% Pass Rate
  • 365 Days Free Update
  • Verified By Professional IT Experts
  • 24/7 Live Support
  • Instant Download PDF&VCE
  • 3 Days Preparation Before Test
  • 18 Years Experience
  • 6000+ IT Exam Dumps
  • 100% Safe Shopping Experience

Cisco 300-620 Last Month Results

745
Successful Stories of Cisco 300-620 Exam
98.3%
High Score Rate in Actual Cisco Exams
96.3%
Same Questions from the Latest Real Exam

300-620 Online Practice Questions and Answers

Questions 1

An engineer is implementing Cisco ACI at a large platform-as-a-service provider using APIC controllers, 9396PX leaf switches, and 9336PQ spine switches. The leaf switch ports are configured as IEEE 802.1p ports. Where does the traffic exit from the EPG in IEEE 802.1p mode in this configuration?

A. from leaf ports tagged as VLAN 0

B. from leaf ports untagged

C. from leaf ports tagged as VLAN 4094

D. from leaf ports tagged as VLAN 1

Show Answer
Questions 2

What is the effect of enabling the disable Remote EP learn feature?

A. It disables remote IP endpoint learning on all leaf nodes in the fabric.

B. It disables remote IP endpoint learning on leaf switches that do not have L3Outs.

C. It limits learning of compute leaf endpoints on border leaves.

D. It prevents border leaf switches from receiving routes through peering with external routers.

Show Answer
Questions 3

Refer to the exhibit.

New e-commerce software is deployed on Cisco ACI fabric. The environment must meet these requirements:

1.

The overall number of contracts must be reduced by reusing the existing contracts within a VRF when possible.

2.

The e-commerce software must communicate only with software EPGs that are part of the same ANP.

3.

The e-commerce software must be prevented from communicating with applications in different ANPs. Which scope must be selected to meet these requirements?

A. Application Profile

B. Endpoint Group

C. Tenant

D. Global

Show Answer More Questions

Success Stories

mcitp

  • Macedonia
  • Nov 26, 2023
  • Rating: 4.3 / 5.0

I'm very happy that I passed the exam successfully. Recommend.


Download Free Cisco 300-620 Demo

Experience Certbus exam material in PDF version.
Simply submit your e-mail address below to get started with our PDF real exam demo of your Cisco 300-620 exam.

Instant download
Latest update demo according to real exam

*Email Address

* Our demo shows only a few questions from your selected exam for evaluating purposes