SDM_2002001050 Dumps

  Printable PDF

  Unencrypted VCE

Nokia SDM_2002001050 dumps - 100% Pass Guarantee!

Rating: 4.6

Vendor: Nokia

Certifications: Nokia Certification

Exam Name: SDM Certification - NI

Exam Code: SDM_2002001050

Total Questions: 160 Q&As

Last Updated: Apr 20, 2024

Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $45.99 VCE Only: $49.99 VCE + PDF: $59.99

PDF

  • Q&As Identical to the VCE Product
  • Windows, Mac, Linux, Mobile Phone
  • Printable PDF without Watermark
  • Instant Download Access
  • Download Free PDF Demo
  • Includes 365 Days of Free Updates

VCE

  • Q&As Identical to the PDF Product
  • Windows Only
  • Simulates a Real Exam Environment
  • Review Test History and Performance
  • Instant Download Access
  • Includes 365 Days of Free Updates

Nokia SDM_2002001050 Last Month Results

671
Successful Stories of Nokia SDM_2002001050 Exam
99.1%
High Score Rate in Actual Nokia Exams
95.2%
Same Questions from the Latest Real Exam
  • 99.1% Pass Rate
  • 365 Days Free Update
  • Verified By Professional IT Experts
  • 24/7 Live Support
  • Instant Download PDF&VCE
  • 3 Days Preparation Before Test
  • 18 Years Experience
  • 6000+ IT Exam Dumps
  • 100% Safe Shopping Experience

SDM_2002001050 Q&A's Detail

Exam Code: SDM_2002001050
Total Questions: 160

SDM_2002001050 Online Practice Questions and Answers

Questions 1

Which inputs are needed when doing the service demand plan update for a project?

A. Project organisation chart, rollout schedule and WBS code.

B. Line organisation chart, needed number of people and needed time frames.

C. Rollout schedule, needed number of people, needed skills and needed time frames.

D. Material list, rollout schedule and needed time frames.

Show Answer
Questions 2

What is the right timing to review the costs in a subcontractor contract?

A. Only when the Customer pushes NSN to reduce costs.

B. When there is a change in the scope.

C. Periodically or when Customer asks for price revisions.

D. When the contractor shows a bad performance.

Show Answer
Questions 3

The Project Manager is only authorized to place orders to vendors ...

A. 1. if CT Head gave instruction for the order

2.

within the guidelines and definitions documented in the Project Procurement Plan

3.

if he has received a written offer from the supplier

4.

using SAP or Modular Logistics System (MLS)

B. 1. within the approved scope of the project

2.

within the guidelines and definitions documented in the Project Procurement Plan

3.

using suppliers which have been approved for this specific project and with which valid frame

contracts exist

4.

using SAP or Modular Logistics System (MLS)

C. 1. after Gate 6 of the NSN Sales Process

2.

if the PM has informed the procurement department

3.

using suppliers which have been approved for this specific project and with which valid frame

contracts exist

4.

sending PO through email or fax to the supplier

D. 1. within the approved scope of the project

2.

within the guidelines and definitions documented in the Project Procurement Plan

3.

using suppliers with good reputation and a good personal relationship with the PM

4.

sending the PO in written form such as email or fax.

Show Answer
Questions 4

Why is 'Staged Acceptance' the preferred acceptance procedure for rollout projects in NSN?

A. Because 'Staged Acceptance' helps to reduce NSN's effort for drive tests.

B. Because 'Staged Acceptance' helps to reduce NSN's administrational efforts for customer invoicing.

C. Because 'Staged Acceptance' helps to reduce project asset levels by introducing multiple invoices.

D. Because 'Staged Acceptance' simplifies the customer acceptance process by reducing the customer's involvement.

Show Answer
Questions 5

What is the first step a PM needs to do if a KPI, compared to the previous periods, is below the average?

A. Organize asap a meeting with project stakeholders.

B. Analyze if the variation compared to the average is within the same range as previous periods.

C. Have a serious discussion with the project FandC and give him a final warning to improve the KPI.

D. Initiate a recovery plan to improve the KPI

Show Answer More Questions

Add Comments

Comment will be moderated and published within 1-4 hours

Success Stories

  • United Kingdom
  • Carlos
  • Apr 23, 2024
  • Rating: 4.9 / 5.0

I purchased the dumps one month ago and I learned a lot from the dumps. I will attend the exam tomorrow, I feel very confident now. Good luck to me.


  • Egypt
  • Obed
  • Apr 22, 2024
  • Rating: 4.2 / 5.0

Nice study material, I passed the exam with the help of it. Recommend strongly.


  • Jordan
  • Zard
  • Apr 21, 2024
  • Rating: 4.4 / 5.0

This file is so much valid, I passed the SDM_2002001050 exam successfully. thanks for my friend introduce this dumps to me.


  • Cambodia
  • Kim
  • Apr 21, 2024
  • Rating: 4.4 / 5.0

I appreciated this dumps not only because it helped me pass the exam, but also because I learned much knowledge and skills. Thanks very much.


  • India
  • Rudy
  • Apr 21, 2024
  • Rating: 4.5 / 5.0

Thanks for your help. I passed my exam yesterday with a high score. I think you have the great dumps. all my questions are from your materials. I'm very happy with that. Thanks.


  • South Africa
  • Nathen
  • Apr 19, 2024
  • Rating: 4.8 / 5.0

Passed today......... Thanks a lot guys! I only Study your manuals and sims. Valid dumps! Good luck to u all~!


  • Algeria
  • ZoZo
  • Apr 19, 2024
  • Rating: 4.4 / 5.0

Thanks a lot and good luck to everybody.


  • Australia
  • Jordan
  • Apr 17, 2024
  • Rating: 4.8 / 5.0

The version is complete and accurate. The most important is that this dumps update quickly and there are many new questions . So I felt confident in exam. Recommend.


  • Macedonia
  • Mace
  • Apr 16, 2024
  • Rating: 4.5 / 5.0

This dumps is valid. I just pass the exam with it. The answers are accurate.Recommend.


  • Singapore
  • Zy
  • Apr 16, 2024
  • Rating: 4.7 / 5.0

At first, I don’t think I can pass the SDM_2002001050 exam. But when I used this dumps, I felt more confident to pass the exam. It is not out of my expectation, i passed the exam with the full score because I met many same question that i have done in this dumps. Thanks these dumps, it is useful.