A company is in the process of configuring their Top of Rack (ToR) switches as a single rack that replicates to a secondary data center with vSphere Replication. What is a consideration for this configuration?

A. IPv6 and IPv4 multi-cast should be layer-3 routed between data centers

B. IPv6 and IPv4 multi-cast should span the entire network in each data center

C. IPv6 and IPv4 multi-cast traffic does not need to leave the ToR switches D. IPv6 and IPv4 multi-cast traffic should span layer-2 between data centers

Browse 196 Q&As
Questions 5

Which software component is an optional add-on for VxRail?

A. Dell EMC Secure Remote Support

B. VMware vRealize Log Insight

C. VMware vSAN

D. VMware vRealize Operations

Browse 196 Q&As
Questions 6

A company is planning to deploy VxRail for business critical applications. The solution should support automated workload re-balancing.

Which vSphere license is required for this solution?

A. vSphere with Operations Management Enterprise

B. vSphere Enterprise Plus

C. vSphere Enterprise

D. vSphere Standard

Browse 196 Q&As
Questions 7

Which vSAN features are specific to an all-flash model VxRail?

A. Erasure Coding and Stretch Clustering

B. Thin Swap Objects and Stretch Clustering

C. Deduplication/Compression and Thin Swap Objects

D. Deduplication/Compression and Erasure Coding

Browse 196 Q&As
Questions 8

A company intends to deploy VxRail for their heavy database workloads. Which type of VxRail nodes should be recommended?

A. E Series

B. P Series

C. V Series

D. S Series

Browse 196 Q&As
Questions 9

What accurately describes the positioning of a VxRail?

A. Can start small and grow with a low entry cost

B. Software defined solution with rack scale and integrated networking

C. Can start small and grow to hundreds of nodes

D. Converged architecture with enterprise grade resiliency

Browse 196 Q&As
Questions 10

An all-flash VxRail cluster has just been deployed. When attempting to enable compression, the option is grayed out. What is the cause of this situation?

A. "Add disks to storage" is set to manual

B. Erasure Coding is not enabled

C. Erasure Coding is not disabled

D. "Add disks to storage" is set to automatic

Browse 196 Q&As
Questions 11

What is used to control remote access to VxRail through SRS?

A. VxRail Manager

B. SRS VE Gateway

C. vCenter

D. Policy Manager

Browse 196 Q&As
Questions 12

You are expanding the capacity of a Hybrid VxRail by creating an additional disk group. The new disk group will be composed of five drives on all participating cluster nodes. When you attempt to add the new disks to the vSAN datastore you receive an error message about there being no cache tier available.

What is the likely cause?

A. vSAN supports disk groups with four drives or fewer

B. Cluster requires vSAN Advanced or Enterprise license upgrade

C. You attempted to add the disks to the existing disk group

D. All the drives are labeled as HDDs

Browse 196 Q&As
Questions 13

When resetting a Dell PowerEdge-based VxRail node to an existing factory image, which boot device should be selected?

A. BOSS

B. RASRUSB

C. SATADOM

D. IDSDM

Browse 196 Q&As
Questions 14

What software component is part of the VxRail Operations and Management Stack?

A. VMware vCenter

B. vRealize Automation

C. Secure Remote Services

D. vRealize Operations

Browse 196 Q&As
Questions 15

A VxRail deployment has just been completed, and the performance service is enabled. The vSAN backend IOPS metrics are not available for the cluster. What is the reason for this issue?

A. Data has not been populated yet.

B. Health service has not been turned on

C. Monitoring policy has not been created

D. Performance service has not been disabled and re-enabled

Browse 196 Q&As
Questions 16

You have been assigned to perform a hardware installation of three G560 nodes in a 4-post rack However, only static rails are included with this shipment.

What is the best way to proceed?

A. Order sliding rails, since these are required for the installation

B. You cannot proceed because these nodes cannot be installed in 4-dost rack

C. Install cable management arms in the rack

D. Proceed directly because these nodes can be installed in a 4 post rack

Browse 196 Q&As
Questions 17

A VxRail deployment has just been completed. The vSAN backend IOPS metrics; are not available for the Cluster What is the reason for this issue?

A. Performance Service has not been turned on

B. Health service has not be turned on

C. vSAN storage policy has not been assigned

D. Data has not been populated

Browse 196 Q&As
Questions 18

You have been supplied a PEQ for a 4 7 xxx installation However, the spreadsheet VxRail version drop down menu only goes up to 4 5 xxx. What is a likely outcome it you continue using this PEQ?

A. Cluster may be deployed at a lower code level

B. An invalid Appliance JSON file may be generated

C. The VMware vSAN license will be lost

D. Cluster may require a RASR reset after deployment

Browse 196 Q&As
Exam Code: DES-6321
Exam Name: Specialist - Implementation Engineer - VxRail Appliance Exam
Last Update: Dec 13, 2021
Questions: 196 Q&As

PDF

$45.99

VCE

$49.99

PDF + VCE

$59.99