Exam Name: ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012]

Exam Code: CTAL-TM_SYLL2012

Total Questions: 64 Q&As

Last Updated: Sep 28, 2022

Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $45.99 VCE Only: $49.99 VCE + PDF: $59.99

ISQI CTAL-TM_SYLL2012 PDF&VCE Dumps Download

  • 99.5% Pass Rate
  • 365 Days Free Update
  • Verified By Professional IT Experts
  • 24/7 Live Support
  • 378,380+ Satisfied Customers
  • 3 Days Preparation Before Test
  • 18 Years Experience
  • 6000+ IT Exam Dumps
  • 100% Safe Shopping Experience

ISQI CTAL-TM_SYLL2012 Last Month Results

355
Successful Stories of ISQI CTAL-TM_SYLL2012 Exam
98.4%
High Score Rate in Actual ISQI Exams
90.7%
Same Questions from the Latest Real Exam

CTAL-TM_SYLL2012 Online Practice Questions and Answers

Questions 1

Consider an information system of a Pay-Tv company based on a SOA architecture. The integrated system currently consists of three core systems:

-

a CRM (Customer Relationship Management) system

-

a BRM (Billing and Revenue Management) system

-

a CAS (Conditional Access System) system all of them communicating with SOA Middleware.

You have been asked to manage the testing activities for the integration of two additional off-the- shelf systems from two different vendors: a SMS (Short Message Service) server and an IVR (Interactive Voice Response) system.

Assume that there is a high likelihood that the two off-the-shelf systems will be low-quality and that you have a clear proof that the testing performed by the two vendors on their systems has been unsystematic and unprofessional. This

obviously leads to higher quality risk for the overall integrated system.

You are the Test Manager of this project. Your main goal is to plan for testing activities to mitigate this risk.

Which of the following answers best describes the test activities (assuming it is possible to perform all of them) you should plan for?

A. You should plan for an informal and minimal acceptance test of the two off-the-shelf systems and then a single end-to-end test of the overall integrated system

B. You should directly plan for a single end-to-end test focused on end-to-end tests of the overall integrated system without an acceptance test of the two off-the-shelf systems

C. You should plan for two levels: a system integration test and an end-to-end test of the overall integrated system

D. You should plan for adequate re-testing of both the systems followed by a system integration test and an end-to-end test of the overall integrated system

Show Answer
Questions 2

Assume you are currently working on a project developing a system where functional requirements are very well specified. Unfortunately non-functional requirements do almost not exist.

You are the Test Manager. You have to choose a technique for test selection that allows testing of non-functional characteristics, especially reliability.

Which of the following techniques for test selection do you expect being most useful in this scenario?

A. A model-based technique based on the creation of operational profiles

B. Ambiguity reviews

C. Test condition analysis

D. Cause-effect graphing

Show Answer
Questions 3

In the test strategy document your organization declares:

-

To adopt a V-model development lifecycle, with three formal levels of testinG. unit, integration and system testing

-

To use a blended risk-based and regression-averse testing strategy for each level of testing

The following is an excerpt of the "approach" section for the system test plan document of a new project:

"Testing will only use manual tests. Due to the short period of time for test execution, the following activities will be performed in parallel with test execution: Test planning, test analysis and test design.

Basic metrics will be taken for test effort (i.e. person-hours), test cases executed (passed/failed), and incidents (no more metrics, such as code coverage, will be collected)."

In the system test plan, no deviations from the test strategy are described.

Based only on the given information, which of the following statements is true?

A.

The approach described in the system test plan document is consistent with the test strategy

B.

The approach described in the system test plan document is consistent with the risk-based testing strategy, but it is inconsistent with the regression testing strategy

C.

The approach described in the system test plan document is consistent with the regression testing strategy, but it is inconsistent with the risk-based testing strategy

D.

The approach described the system test plan document is inconsistent with both the risk-based and regression testing strategies

Show Answer More Questions

Success Stories

Carlos

  • United Kingdom
  • Sep 29, 2022
  • Rating: 4.9 / 5.0

I purchased the dumps one month ago and I learned a lot from the dumps. I will attend the exam tomorrow, I feel very confident now. Good luck to me.


Tony

  • United States
  • Sep 29, 2022
  • Rating: 4.8 / 5.0

yes, i passed the exam in the morning, thanks for this study material. Recommend.


Dwight

  • Hungary
  • Sep 28, 2022
  • Rating: 4.3 / 5.0

Very useful study material, thanks the help of this dumps .


Vic

  • Sri Lanka
  • Sep 27, 2022
  • Rating: 4.6 / 5.0

Great job, you guys. I passed my exam with your help! Thanks for everything!


Quirita

  • New Zealand
  • Sep 26, 2022
  • Rating: 4.5 / 5.0

This dumps was introduced by my good friend several month ago. At first, I don't think it will help me a lot. But when I found many new questions that I never found from other study materials, i begun to pay more attention on this dumps. At last, I only used this dumps for preparing my exam. A moment ago, i have cleared that i passed the exam with almost full score. Thanks for this dumps, i will recommend to others just as my friend do.


Ned

  • Spain
  • Sep 25, 2022
  • Rating: 4.1 / 5.0

Passed full scored. I should let you know. The {sku} exam dump is very good, valid and accurate.


Quentin

  • United States
  • Sep 24, 2022
  • Rating: 4.4 / 5.0

Very good {sku} dumps, take full use of it, you will pass the exam just like me.


Omar

  • Netherlands
  • Sep 23, 2022
  • Rating: 4.2 / 5.0

Thanks for your help. I passed my exam yesterday with the full points! Great job.


Zoubesh

  • Belgium
  • Sep 23, 2022
  • Rating: 4.5 / 5.0

This is very good dumps with almost 100% correct answers, much better than any other dumps. Recommend.


saini

  • Australia
  • Sep 23, 2022
  • Rating: 4.9 / 5.0

i really love this dumps, update quickly and content completely. it is enough for my exam. Recommend.


Download Free ISQI CTAL-TM_SYLL2012 Demo

Experience Certbus exam material in PDF version.
Simply submit your e-mail address below to get started with our PDF real exam demo of your ISQI CTAL-TM_SYLL2012 exam.

Instant download
Latest update demo according to real exam

*Email Address

* Our demo shows only a few questions from your selected exam for evaluating purposes