CCE-CCC Dumps

  Printable PDF

  Unencrypted VCE

Test Prep CCE-CCC dumps - 100% Pass Guarantee!

Rating: 4.5

Vendor: Test Prep

Certifications: Test Prep Certifications

Exam Name: Certified Cost Consultant / Cost Engineer (AACE International)

Exam Code: CCE-CCC

Total Questions: 115 Q&As ( View Details)

Last Updated: Mar 20, 2024

Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $45.99 VCE Only: $49.99 VCE + PDF: $59.99

PDF

  • Q&As Identical to the VCE Product
  • Windows, Mac, Linux, Mobile Phone
  • Printable PDF without Watermark
  • Instant Download Access
  • Download Free PDF Demo
  • Includes 365 Days of Free Updates

VCE

  • Q&As Identical to the PDF Product
  • Windows Only
  • Simulates a Real Exam Environment
  • Review Test History and Performance
  • Instant Download Access
  • Includes 365 Days of Free Updates

Test Prep CCE-CCC Last Month Results

860
Successful Stories of Test Prep CCE-CCC Exam
96.9%
High Score Rate in Actual Test Prep Exams
90.6%
Same Questions from the Latest Real Exam
  • 96.9% Pass Rate
  • 365 Days Free Update
  • Verified By Professional IT Experts
  • 24/7 Live Support
  • Instant Download PDF&VCE
  • 3 Days Preparation Before Test
  • 18 Years Experience
  • 6000+ IT Exam Dumps
  • 100% Safe Shopping Experience

CCE-CCC Q&A's Detail

Exam Code: CCE-CCC
Total Questions: 115
Single & Multiple Choice 115

CCE-CCC Online Practice Questions and Answers

Questions 1

AACE International defines _____________as a technique of economic evaluation that sums over a given study period, the costs of initial investment, replacements, operations, and maintenance/repair; expressed in either present or annual value terms.

A. Risk analysis

B. Benefit/Cost ratio (B/C) method

C. Net present worth method

D. Life cycle costs method (LCC)

Show Answer
Questions 2

Listening to what is being said by all members of a group or audience and then summarizing or interpreting is called______________.

A. Directive listening

B. Non-listening

C. Visual listening

D. Facilitative listening

Show Answer
Questions 3

A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.

The following question requires your selection of CCC/CCE Scenario 26 (2.5.50.1.2) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.

What information is needed to develop a Class 2 definitive estimate?

A. Soil data, detailed construction drawings, quantity takeoffs, minimum contingency detailed indirect costs, detailed engineering estimates

B. Preliminary quantities with labor, material, and factors applied, square footage of facilities, minimum contingency detailed indirect costs

C. Square footage of facilities, factored indirects and home office costs

D. Vendor quotes, home office detailed estimate, preliminary quantities with labor, material, and factors applied

Show Answer
Questions 4

A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.

The project scheduler left the company and has left unfinished work. You have been hired as the new project scheduler and must update the existing schedule. What will be your first task?

A. Recalculate the early finish for each activity

B. Recalculate the early start for each activity

C. Update the remaining duration for each activity

D. Recalculate the critical path

Show Answer
Questions 5

A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.

The recognition of loss of value of a natural resource used in the production process is referred to as:

A. Capital reduction

B. Net loss

C. Depreciation

D. Depletion

Show Answer More Questions

Add Comments

Comment will be moderated and published within 1-4 hours

Success Stories

  • Vancouver
  • Morris
  • Mar 22, 2024
  • Rating: 5.0 / 5.0

Confirmed valid because I just passed my exam. I got all questions from this dumps. Their dumps are really update and accurate. It will be your first choice if you do not have enough time to prepare for your exam. It's enough to use this dumps only. But be sure you understand the answers of the questions but not only memorize the options "mechanically".


  • United States
  • Nick
  • Mar 22, 2024
  • Rating: 5.0 / 5.0

This is the one to turn to for your CCE-CCC exam. I run a training company that teaches 10 - 20 people in certificate exam courses a month and these are the practice that we always hand out with the course. The information is concise and to the point. Everything that you need to know for your exam is contained in these questions. This is not a very tough exam but requires many months of studying, but the end result is well worth it.


  • United States
  • Passit
  • Mar 20, 2024
  • Rating: 5.0 / 5.0

By far the best resource for this exam - not only do they provide accurate answers along with the latest questions, but they provide you the test simulator so that you can practise the questions in a real exam environment. I love this dumps and this site. It is by far the best study aid. I would happily buy your dumps again when I'm going to take my other exams. GREAT work guys!!!


  • India
  • IMlegend
  • Mar 20, 2024
  • Rating: 4.7 / 5.0

i'm very happy that i passed the exam successfully. Recommend.


  • Jordan
  • Zard
  • Mar 20, 2024
  • Rating: 4.4 / 5.0

This file is so much valid, I passed the CCE-CCC exam successfully. thanks for my friend introduce this dumps to me.


  • Oklahoma
  • Settle
  • Mar 19, 2024
  • Rating: 5.0 / 5.0

This dumps is 100% valid. I passed my exam few days ago. I’m not sure how many new questions are there but I’m sure I answered them correctly. But not sure if I answered all other new questions correctly because I do not got a full score. Anyway, I passed my exam. That’s what I want. Really appreciate your great questions and accurate answers!


  • LINCOLN
  • Nathan
  • Mar 19, 2024
  • Rating: 5.0 / 5.0

Three new questions. Just easy questions so you do not need to worry. I joined the training courses for about 2 weeks and then use these dumps to practice the questions. The questions are valid. No incorrect answers like someone said in the forum. You can trust on this. Questions may change in the real exam so you need to read that carefully. Be sure to pay attention to the sequence of the options. May change in the actual exam, too.


  • United Kingdom
  • Harold
  • Mar 19, 2024
  • Rating: 4.3 / 5.0

Dump valid! Only 3 new questions but they are easy.


  • Turkey
  • Adair
  • Mar 19, 2024
  • Rating: 4.7 / 5.0

when i seat for exam, i found that some answers are in different order in the real exam.so you can trust this dumps.


  • Malaysia
  • Xt3r
  • Mar 19, 2024
  • Rating: 4.6 / 5.0

Yeah , Get 869/1000 score, this dumps still valid 100% but the some os answer is not correct.