PR2P Dumps

  Printable PDF

  Unencrypted VCE

EXIN PR2P dumps - 100% Pass Guarantee!

Rating: 5.0

Vendor: EXIN

Certifications: Exin Certification

Exam Name: Exin PRINCE2 Practitioner (PR2P)

Exam Code: PR2P

Total Questions: 190 Q&As ( View Details)

Last Updated: Apr 16, 2024

Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $45.99 VCE Only: $49.99 VCE + PDF: $59.99

PDF

  • Q&As Identical to the VCE Product
  • Windows, Mac, Linux, Mobile Phone
  • Printable PDF without Watermark
  • Instant Download Access
  • Download Free PDF Demo
  • Includes 365 Days of Free Updates

VCE

  • Q&As Identical to the PDF Product
  • Windows Only
  • Simulates a Real Exam Environment
  • Review Test History and Performance
  • Instant Download Access
  • Includes 365 Days of Free Updates

EXIN PR2P Last Month Results

314
Successful Stories of EXIN PR2P Exam
96.9%
High Score Rate in Actual EXIN Exams
97.5%
Same Questions from the Latest Real Exam
  • 96.9% Pass Rate
  • 365 Days Free Update
  • Verified By Professional IT Experts
  • 24/7 Live Support
  • Instant Download PDF&VCE
  • 3 Days Preparation Before Test
  • 18 Years Experience
  • 6000+ IT Exam Dumps
  • 100% Safe Shopping Experience

PR2P Q&A's Detail

Exam Code: PR2P
Total Questions: 190
Single & Multiple Choice 171
Hotspot 19

PR2P Online Practice Questions and Answers

Questions 1

Which of the following statements would NOT be included in the Project Product Description?

A. Purpose of the product

B. Composition

C. Project level tolerances

D. Quality criteria

Show Answer
Questions 2

Product based planning focuses on which of the following:

1.

Creating product descriptions

2.

Identifying activities

3.

Creating a Product hierarchy

4.

Creating a Product sequence

A. 1, 2, 3

B. 2, 3, 4

C. 1, 3, 4

D. 1, 2, 4

Show Answer
Questions 3

Project Scenario

Calendar Project (Note: The companies and people within the scenario are fictional.)

There has been a reduction in fie number of orders at the MNO Manufacturing Company due in part to the increased marketing activities of its competitors. To help counter this, the company has decided to create a promotional calendar for next year for all its current and prospective customers. The end product of this project will be a prepared calendar pack, ready for printing. The design of the calendar will be similar to one sent out previously, and must reflect the company image as described in the existing corporate branding standards. Another project is currently producing a new company logo when is to be printed on each page of the promotional calendar. The prepared calendar pack will consist of: Design for each month - correctly showing at public holidays and new company logo Selected photographs- 12 professionally-produced photographs, showing different members of staff Selected paper and selected envelope - for printing and mailing the calendar Chosen label design - a competition to design a label will be held as part of this project List of customers - names and addresses of customers to whom the calendar will be sent.

The project is currently in initiation and will have two further stages:

Stage 2 will include tie activities to:

Create the customer fast using information from the Accounts and Marketing departments

Confirm compliance with the Data Protection Legislation

Create a design for each month - this will be done by the internal creative team Select and appoint a professional photographer

Gather photograph design ideas from previous project and agree photographic session schedule

Prepare a production cost forecast

Select paper and envelope.

Stage 3 will include the activities to:

Produce and select tie professionally-taken photographs

Hold the label design competition and choose the label design

Assemble the prepared calendar pack.

A production cost forecast, based on the options and costs for the paper, envelope, printing and marketing of the calendar is to be produced in stage 2. However, the actual production and distribution of the calendars is not within the scope of

the project. The product cost forecast will be reviewed by the Project Board to determine whether tie project should continue.

It is now 05 October and the prepared calendar pack must be delivered to the print company by 30 November, to enable printing and distribution of the calendar in time for Christmas. The cost of the activities to develop the specialist products

and the cost of the project management activities are estimated to be £20,000. There is a project time tolerance of +1 week /-2 weeks and a project cost tolerance of +£6,000 / -£6,000. A change budget of £500 has been allocated but there is

no risk budget.

During stage 2, if the Project Manager decides to recommend that the Project Plan is revised to finish three weeks later, which statement is correct?

A. The tolerances stated in the Project Plan CANNOT be changed.

B. The Executive needs to seek formal approval from corporate management to implement this change.

C. The current project must close prematurely and be restarted with a new Project Plan, a new Business Case and new Risk Register.

D. The revision of the Project Plan would have to wait until the end stage assessment of stage 2.

Show Answer
Questions 4

Scenario

Additional Information

Extract from the Communication Management Strategy.

The project information in the table below is true, but it may not be recorded under the correct heading or be in the correct document.

Using the Project Scenario, select the appropriate response to each of the following 5 questions which have been raised by the Project Board. The project is now at the end of the initiation stage. Having decided that the Calendar project is a relatively simple project, the Project Manager combined the Starting Up a Project process and the Initiating a Project process. No Project Brief has been produced. Instead the Project Manager used the project mandate to produce a simple Project Initiation Documentation (PlO). The PlO includes the Business Case, a product checklist and several Product Descriptions, Including the Project Product Description. Short sections are also included for each of the strategies and the controls to be applied. The Project Manager has elected to use the Daily Log to record all risks, issues, lessons and quality - results. After the initiation stage there will be two further stages during which a small number of Work Packages will be authorized. While these are being managed, the Project Manager will hold regular checkpoints, which will support the production of weekly Highlight Reports to the Project Board.

This question provides a number of changes which may or may not be required to the Extract from the Communication Management Strategy provided in the additional information.

Which statement applies to the Timing of communication activities section?

A. Delete entry 9 because activities for controlling the project should be planned as part of Project controls in the Project Initiation Documentation.

B. No change to entry 9 because it describes the timing of performance reports.

C. Delete entry 10 because Highlight Reports are a Project Board control, the frequency of which should be recorded in the Project controls section of the Project Initiation Documentation.

Show Answer
Questions 5

Which of the following is NOT a trigger for the project manager to authorize a work package?

A. Stage Authorization

B. Corrective Action

C. Exception plan approved

D. Reporting highlights

Show Answer More Questions

Add Comments

Comment will be moderated and published within 1-4 hours

Success Stories

  • United States
  • Luka
  • Apr 23, 2024
  • Rating: 4.6 / 5.0

My good friend introduced this material to me. It really useful and convenient. I just prepared the exam by using this material and achieved high score than others. So I'm very happy. Thanks my friend and this material.


  • Belgium
  • Zoubesh
  • Apr 18, 2024
  • Rating: 4.5 / 5.0

This is very good dumps with almost 100% correct answers, much better than any other dumps. Recommend.


  • Myanmar
  • Dean
  • Apr 18, 2024
  • Rating: 4.1 / 5.0

This dumps is helpful and convenient, you can trust on it .Good luck to you.


  • Ortiz
  • Luciano
  • Apr 18, 2024
  • Rating: 5.0 / 5.0

This dumps is really great! I passed my exam with a satisfied result. I prepare for my exam only with this dumps. Spend only 5 days going through all the questions. I think this dumps is enough for you if you just want to pass the exam. If you want to get a full score, I suggest you to learn with text books and take courses. It’s OK to prepare only with this exam dumps if you just want to get passed.


  • United States
  • TW
  • Apr 17, 2024
  • Rating: 5.0 / 5.0

I'm only part way through the dumps, but I've been impressed with the writing, content, and presentation of the material. I've read several of the other study guides, and those authors seem more disorganized or believe more words rather than concise content make the material.


  • Lueilwitz
  • Corkery
  • Apr 17, 2024
  • Rating: 5.0 / 5.0

I passed my PR2P with this dumps so I want to share tips with you. Check the exam outline. You need to know which topics are required in the actual exam. Then you can make your plan targeted. Spend more time on that topic are much more harder than others. I got all same questions from this dumps. Some may changed slightly (sequence of the options for example). So be sure to read your questionscarefully. That’s the most important tip for all candidates.


  • India
  • Vadim
  • Apr 17, 2024
  • Rating: 4.9 / 5.0

I passed the PR2P exam with a perfect score. I'm so happy now. Thanks for my friends' introduction, thanks for these dumps.


  • Netherlands
  • Omar
  • Apr 17, 2024
  • Rating: 4.2 / 5.0

Thanks for your help. I passed my exam yesterday with the full points! Great job.


  • United States
  • John
  • Apr 16, 2024
  • Rating: 5.0 / 5.0

I signed up for the exam and ordered dumps from this site. I never attended any bootcamp or classes geared to exam or material preparation. However, I was shocked to find all the time, money and energy people spent preparing to take this test. Honestly, it started to make me nervous, however, it was too late to turn back. I just bought this and read it in 6-days, and I took the exam on the 7th day. That was enough. Just go through the dumps and take the test.


  • Turkey
  • Adonis
  • Apr 16, 2024
  • Rating: 4.9 / 5.0

this dumps is valid. thanks for your help.