Click the Exhibit button.

Referring to the diagram shown in the exhibit, what will happen if PDU-B fails?

Exhibit:

A. Both Node A and Node B will remain online and all disk shelves will remain online.

B. Both Node A and Node B will remain online, but all disk shelves will immediately lose power and become inaccessible.

C. Both Node A and Node B will immediately lose power and become inaccessible.

D. Node A will immediately lose power and become inaccessible. Node B will remain online.

Browse 65 Q&As
Questions 5

A customer has a clustered Data ONTAP solution and needs to connect several Windows 2012 servers using iSCSI for LUN access.

Before the LUN can be seen, what must be configured on the host?

A. the LUN partitioning

B. the Host Utilities Kit

C. the iSCSI software initiator

D. the HBA queue depth

Browse 65 Q&As
Questions 6

Exhibit

You have a 2-node data ONTAP 8.3 cluster.

Based on the exhibit, which change must be made to make svm1 conform to iSCSI best practices?

cl01::> net int show -vserver svm1 -data -protocol iscsi Logical Status Network Current Current Is Vserver Interface Admin/Oper Address/Mask Node Port Home

svm1 up/up 10.204.34.25/24 cl01-01 a0a 434 true cl01::>iscsi show -vserver svm1 Vserver: svm1 Target Name: iqn.1992 08.com.netapp: sn.ca5eaa069c211 Target Alias: svm1 Administrative Status: up

A. The iSCSI LIFs must be moved to a VLAN higher than 1024.

B. An iSCSI LIF must be added to node cl01-02.

C. The Target Alias must be modified to match the Target Name.

D. The iSCSI LIFs must be moved to a physical interface; iSCSI LIFs are not supported on top of an ifgrp.

Browse 65 Q&As
Questions 7

You are asked to migrate a SAN LIF to a node that was recently added to your cluster. The following CLI command was provided to you to complete the migration:

network interface modify -vserver svm1 -lif lif1 home -node cl01-04 -homeport6a

Which step is missing?

A. All hosts connecting to the controller through lif1 must be shut down.

B. The LIF must first be added to a portset.

C. Your zoning must be updated on the upstream switch.

D. The LIF must be put in a status-admin down state.

Browse 65 Q&As
Questions 8

Exhibit

cl01::>igroup show -vserver svm1 VserverIgroup Protocol OS Type Initiators svm1 esx_cluster mixed vmware

20:00:00:25:b5:11:a0:01,

20:00:00:25:b5:11:b0:01,

iqn.1998-01.com.vmware:esx02

cl01::>

A customer is provisioning storage for two ESXi hosts using FCoE with CNA adapters. The customer mapped the LUN to the igroup shown in the exhibit. After scanning for new devices, the LUN is only seen by one of the ESXi hosts.

What caused the problem?

A. One of the hosts is added in the igroip via iSCSI IQN.

B. The igroup protocol needs to be configured as FCP.

C. The switch zoning configuration does not include the correct initiators.

D. The LIFs are not on their home ports.

Browse 65 Q&As
Questions 9

When designing a new SAN solution, which three components should be verified with the IMT? (Choose three.)

A. the connection protocol

B. the patch panel make and model

C. host OS type and version

D. the type of Ethernet switch

E. the clustered Data ONTAP version

Browse 65 Q&As
Questions 10

A customer has recently deployed a clustered Data ONTAP 8.3 system and is trying to mount LUNs to a Windows 2012 Server using the iSCSI protocol. They have enabled jumbo frames on their nodes as well as their Windows 2012 Server. Whenever they attempt to scan for a new LUNs, Disk Management times out and does not present any new storage.

What is causing the problem?

A. Windows 2012 does not support jumbo frames with the iSCSI protocol.

B. Clustered Data ONTAP 8.3 does not support the iSCSI protocol.

C. They have jumbo frames enabled on the host and storage, but not the Ethernet switches.

D. Clustered Data ONTAP 8.3 does not support jumbo frames with the iSCSI protocol.

Browse 65 Q&As
Questions 11

Exhibit

cl01-01::>vol show -vserver svm1 volume v_iscsi_exch01 Vserver Name: svm1 Volume Name: v_iscsi_exch01 Aggregate Name: a1_cl01_sas Volume Size: 5 GB Volume State: online Volume Type: RW Volume Style: flex Available Size: 4.75GB Filesystem Size: 5GB Total User-Visible Size:

4.75 GB Used Size: 144 KB Used Percentage: 5% Volume Nearly Full Treshold Percent: 95% Volume Full Treshold Percent: 98% Maximum Autosize (for flexvolvs only): 6GB (DEPRECATED) -Autosize Increment (for flexvolvs only): 256MB Minimum Autosize: 5GB

Autosize Grow Threshold Percentage: 85% Autosize Shrink Threshold Percentage: 50% Autosize Mode: off Autosize Enabled (for flexvolvs only): false Space Guarantee Style: volume Space Guarantee in Effect: true Snapshot Directory Access Enabled: true Space Reserved for Snapshot Copies: 5% Snapshot Reserve Used: 0% Snapshot Policy: none Node name: cl01-01 Reserved Space for Overwrites: 0B Fractional Reserve: 100% Primary Space Management Strategy: volume_grow Total Physical Used Size: 144KB Physical Used Percentage: 0%

A customer has a volume with the configuration shown in the exhibit.

What will happen if the volume vs_iscsi_exch01 reaches 85% used?

A. The volume will delete snapshots until 20% is free in the volume.

B. The volume will automatically grow up to 6 GB.

C. The volume will no longer be accessible from the host.

D. The volume will continue working as expected.

Browse 65 Q&As
Questions 12

A customer has a host experiencing performance problems with its FC LUNs. The customer has examined the nodes hosting the LUNs, and both the disk and CPU performance are below 50% utilization. The

customer examined the switch ports connected to the storage array, and they are also below 50% utilization.

Which three should the customer verify? (Choose three.)

A. that the HBA queue depth is set properly

B. that the host HBA has the correct port settings

C. that the host Ethernet interfaces are using jumbo frames

D. that the host is running SnapDrive

E. that the FC switch ports connected to the host have not exceeded the maximum capacity

Browse 65 Q&As
Questions 13

A customer is configuring their host for FC connectivity to a clustered Data ONTAP storage solution. They have installed a 4 GB FC HBA into the host and connected it with optical cables to an 8 GB FC switch. They have also connected the UTA2 ports from the FAS2552 with 16 GB SFP+ optics installed using optical cables to the switch.

Which two actions will improve host FCP throughput? (Choose two.)

A. replacing the existing 8 GB FC switch with a new 16 GB FC switch.

B. replacing the switch with a 10 GB Ethernet switch

C. adding 16 GB FC HBA and appropriate optics

D. replacing the optical cables with copper TwinAx cables.

Browse 65 Q&As
Questions 14

A customer has recently deployed a clustered Data ONTAP 8.3 system and is trying to mount LUNs to a Windows 2012 Server using the iSCSI protocol. They are using Cisco Nexus 5548 network switches and the network administrator has informed the storage administrator that the ports are set to switchport mode trunk. The storage administrator has also been informed that the host and storage should be using VLAN 400 for iSCSI traffic. When the storage administrator attempts to add the SVM as an iSCSI target, it fails to connect.

What is causing the problem?

A. The storage administrator has not enabled VLAN tagging on the storage ports.

B. Clustered Data ONTAP 8.3 does not support the iSCSI protocol on a VLAN tagged interface.

C. Windows 2012 Server does not support the iSCSI protocol on a VLAN tagged interface.

D. Clustered Data ONTAP 8.3 does not support running iSCSI on a VLAN ID below 1024.

Browse 65 Q&As
Questions 15

A Windows 2012 Server has a 1 GB thin-provisioned LUN in a 10 GB thin-provisioned volume. After copying a 500 MB file to the LUN, you observe the LUN using 500 MB of space in the volume. After deleting the 500 MB file, you observe the LUN is still using 500 MB of space in the volume.

Which two steps are required to reclaim the space? (Choose two.)

A. Press Optimize in the Windows Defragment and Optimize Drives utility.

B. Enable space-allocationon the LUN.

C. Run TRIM on the host.

D. Empty the Recycle Bin on the host.

Browse 65 Q&As
Questions 16

Exhibit

cl01::>lun mapping show vserver svm1 path /vol/svm1_vol1/lun1 igroup svm1-ig1 Vserver Name: svm1 LUN path: /vol/svm1_vol1/lun1 Volume Name: svm1_vol1 Qtree Name: "" LUN Name: lun1 Igroup Name: svm1-ig1 Igroup OS Type: windows

Igroup Protocol Type: iscsi LUN ID: 3 Portset Binding Igroup: ALUA: true Initiators: iqn.199105.com.microsoft: host1 LUN Node: cl01-04 Reporting Nodes: cl01-01, cl01-02, cl01-03, cl01-04

You have a 2-node cluster. You have added an HA pair with all flash drives for a high- performance database that is currently experiencing performance problems on SAS drives. The LUN shown in the exhibit is moved from cl01-01 to cl01-04 to address the problems.

What is the next step in this scenario?

A. Rescan the host to discover the new LUN location.

B. Remove the old path entries from the host.

C. Remove the previous owner and partner from the reporting nodes list.

D. Unmap the LUN, then remap the LUN.

Browse 65 Q&As
Questions 17

Exhibit

cl01::> net int show -vserver svm1 (network interface show) Logical Status Network Current Current Is Vserver Interface Admin/Oper Address/Mask Node Port Home

svm1 fc_lif1 up/up 20:0b:00:a0:98:4e:ba:14 cl01-01 3a true fc_lif2 up/up 20:0c:00:a0:98:4e:ba:14 cl01-02 3a true lif1 up/up 172.16.21.31/24 cl01-01 a0a true

lif2 up/up 172.16.21.32/24 cl01-02 a0a true 4 entries were displayed. cl01::>

Referring to the exhibit, a customer needs to move LIF "fc_lif1" to a new port.

Which three actions must be performed to accomplish this task? (Choose three.)

A. Remove LIF from the existing portset.

B. Quiesce all hosts accessing LUNs over the LIF.

C. Take the LIF offline.

D. Update the switch zone to include the new WWPN.

E. Move the LIF to a new home port using the network interfacemodify command.

Browse 65 Q&As
Questions 18

Click the Exhibit button.

A customer has deployed a new FAS8080EX running clustered Data ONTAP 8.3. Host A is running multipath software that has been properly configured. Also, Host A is currently accessing a LUN using the FC protocol stored on Node A. Switch A, shown in the exhibit, fails.

What will happen next?

Exhibit:

A. Node A will panic causing a storage failover to Node B.

B. Host A will lose all access to its LUN.

C. Host A will continue to access its LUN using Switch B through Node B.

D. Host A will continue to access its LUN using Switch B through Node A.

Browse 65 Q&As
Exam Code: NS0-506
Exam Name: NetApp Certified Implementation Engineer - SAN, Clustered Data ONTAP
Last Update: Apr 19, 2024
Questions: 65 Q&As

PDF

$45.99

VCE

$49.99

PDF + VCE

$59.99