Entity Relationship Diagrams identify:
A. Trace the movement of information through a process
B. How and when transformations occur
C. Define all of the components of a specific activity
D. Who and what are involved in a process and how they interact
If Project A has inspected 1546 requirements in 54 hours and found 441, what is the Inspection Rate for Project A?
A. 28.63
B. 3.05
C. 20.02
D. 8.17
A listing of the assets, liability, and equity accounts is a:
A. Profit and Loss Statement
B. Gap Analysis
C. Balance Sheet
D. Projection
Mission Statements are focused on the future and provide a road map for change.
A. True
B. False
______________are expenses which reduce income (but not cash), therefore reducing potential tax liabilities.
A. Amortization and Depreciation
B. Balance Sheet
C. Capital
D. Equity
A Formal Inspection is a:
A. Walkthrough of a product for the purpose of familiarizing the stakeholders with the product attributes
B. Unstructured review process conducted at the end of a life cycle phase
C. Rigorous, structured approach to finding defects
D. None of the above
Which of the following is NOT a category of Enterprise Requirements?
A. Standardization
B. Accessibility
C. Portability
D. Control
Mary's requirement that she should be able to change the screen color whenever she wants represents which of the following Quality Requirements?
A. Reusability
B. Flexibility
C. Portability
D. Maintainability
Unit Testing generally refers to the testing done by:
A. The business analyst during the requirements phase
B. The developer at the small component level
C. The system tester when testing completed modules
D. The user during acceptance testing
Rapid Application Development is a variation of:
A. Waterfall
B. Iterative
C. Prototype
D. Exploratory Model
Which of the following teams provides the installation and maintenance environment to support acceptance testing activities?
A. Data Security Staff
B. Operations and Network Staff
C. Internal Audit Team
D. Verification Control Team
The following are the critical functions that a defect reporting and tracking tool must have, EXCEPT:
A. Capture Narrative Information
B. Capture Statistical Information
C. Track Defect to Closure
D. Identifies the Staff Person who made the Error / Defect
MOTS is an acronym for:
A. Modified Off-The-Shelf Software
B. Management Oriented Testing System
C. Manipulated Object Training Series
D. Mission, Objectives, Training, Supervision
The work of translating the requirements of what a system must do into a product that will meet those needs is called:
A. Requirements
B. Design
C. Development
D. Prototyping
-- Exhibit -
-- Exhibit -The diagram is of the:
A. ISO 9000
B. Malcolm Balridge Model
C. Capability Maturity Model Integrated
D. Process Workbench
E. None of the above