How do you establish the interface between SAP S/4HANA Sales and Finance? Choose the correctanswer.
A. Set up the general billing interface.
B. Assign a sales organization to a company code.
C. Uniquely assign a distribution channel to a company code.
D. Set up the upload of the billing document request
Which of the following are characteristics of the down payment process in SAPS/4HANA? Choose Two correct answers.
A. The down payment process uses a special billing type (FAZ).
B. The down payment uses a special settlement type (OS 11).
C. The down payment process uses periodic billing.
D. The down payment value is a fixed amount or percentage.
Your project uses the new output managementin SAP S/4HANA. What must you create to print the order confirmation immediately after the order is saved? Choose the correct answer.
A. Output message
B. Decision table entry
C. Transmission medium
D. Condition record
In a standard SAP S/4HANA system, a customer wants to configure output by adding a new field to an existing form. In which case can the form modification be regarded as simple? Choose the correct answer.
A. The field exists in the communication structure, but its format needs to be changed before it can be integrated into the form.
B. The field is NOT recognized in the processing program and needs to be added to the communication structure.
C. The field does NOT yet exist and needs to be added to the database.
D. The field exists in the communication structure and can be integrated in its existing format.
Which confirmation strategies can you select when executing backorder processing (BOP)? Choose Three correct answers.
A. Fail
B. Lose
C. Split
D. Fill
E. Win
Your project requires a rushorder process in which a delivery document is automatically created immediately after the sales order is saved. In which customizing object do you activate this? Choo the correct answer.
A. Sales document type
B. Schedule line category
C. Sales item category
D. Copy control
When using new output management in SAP S/4HANA, how does the system process a BRF+ decision table to retrieve the required result? Choose the correct answer.
A. Every condition column is processed in sequence. In each condition column, every row is processed from top to bottom. If the condition in each condition column cells met, the field values in the result columns are returned.
B. Every row is processed in sequence. In each row, every condition column cell is processed from left to right. If the condition in each condition column cell is met, the field values in the result columns are returned.
C. Every row is processed in sequence. In each row, every result column cell is processed from leftto right. If the condition in each result column cell is met, the field values in the condition columns are returned.
D. Every row is processed in sequence. In each row, every condition column cell is processed from right to left. If the condition in eachcondition column cell is met, the field values in the result columns are returned.
You need to generate a list of conditions for analysis in a standard SAPS/4HANAsystem. Which activity does SAP recommend? Choose the correct answer.
A. Create table joins with underlying tables.
B. Extract condition records and use a tabulation tool.
C. Create an ABAP report.
D. Create a pricing report.