ATM Dumps

  Printable PDF

  Unencrypted VCE

ISTQB ATM dumps - 100% Pass Guarantee!

Rating: 4.5

Vendor: ISTQB

Certifications: Test Manager

Exam Name: Advanced Test Manager

Exam Code: ATM

Total Questions: 64 Q&As

Last Updated: Feb 15, 2024

Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $45.99 VCE Only: $49.99 VCE + PDF: $59.99

PDF

  • Q&As Identical to the VCE Product
  • Windows, Mac, Linux, Mobile Phone
  • Printable PDF without Watermark
  • Instant Download Access
  • Download Free PDF Demo
  • Includes 365 Days of Free Updates

VCE

  • Q&As Identical to the PDF Product
  • Windows Only
  • Simulates a Real Exam Environment
  • Review Test History and Performance
  • Instant Download Access
  • Includes 365 Days of Free Updates

ISTQB ATM Last Month Results

594
Successful Stories of ISTQB ATM Exam
99.3%
High Score Rate in Actual ISTQB Exams
97.2%
Same Questions from the Latest Real Exam
  • 99.3% Pass Rate
  • 365 Days Free Update
  • Verified By Professional IT Experts
  • 24/7 Live Support
  • Instant Download PDF&VCE
  • 3 Days Preparation Before Test
  • 18 Years Experience
  • 6000+ IT Exam Dumps
  • 100% Safe Shopping Experience

ATM Q&A's Detail

Exam Code: ATM
Total Questions: 64

ATM Online Practice Questions and Answers

Questions 1

During the follow-up phase the following conditions are checked: X1. The code has been completely reviewed X2. All the identified defects have been correctly fixed and the modified code has been compiled

successfully and run through all the static analyzers used by the project without warnings and errors X3. The modified code is available under the configuration management system with a new version number for the specified CI

If these conditions are fulfilled then the review process terminates. Which of the following characteristics of a formal review is missing in this description?

K2 1 credit

A. Defined entry and exit criteria

B. Checklists to be used by the reviewers

C. Deliverables such as reports, evaluation sheets or other review summary sheets

D. Metrics for reporting on the review effectiveness, efficiency, and progress

Show Answer
Questions 2

You can count on well-written requirements, but you can't count on an adequate contribution of the stakeholders to the quality risk analysis. You have to mitigate the insufficient contribution of the stakeholders because the risk-based testing approach shall minimize the product risks. Your test team has one expert tester in security testing.

Which of the following test activities would you expect to be the less important in this context?

K4 3 credits

A. Extract from the defect tracking system of the previous project all the security defects and failures, and classify them to support design and execution of specific tests

B. Automate all functional and non-functional system tests

C. Apply systematic and exploratory testing for integration and system test

D. Perform exploratory testing sessions with adequate charters covering security aspects

Show Answer
Questions 3

You are the Test Manager on a project following an iterative life-cycle model. The project should consist of nine iterations of one month duration each. It is planned to develop the most important features to have a stable core of the application in the first three iterations and to add the additional features in the last six iterations. At the beginning of the first iteration, only a draft version of the requirements specification document for the core features is available. Assume that during each of the first three iterations, the chosen features are fully completed and unit tested.

Which of the following statements is true in this context?

K4 3 credits

A. The system test phase should start when all the requirements are frozen

B. You should allocate a large effort for system testing during the first three iterations

C. You should allocate all the effort for the system test phase only in the last iteration

D. You should apply the same test strategy as used in a sequential life cycle model

Show Answer
Questions 4

Based on the historical data of 5 past and similar projects, you have calculated these average numbers of defects detected in system testinG.

-

For each 10000 LOC (lines of code), 200 defects

-

For each person-month of development team effort, 49 defects

You want to use this information to perform estimation for a new project.

The project manager tells you that he/she has estimated 20000 new LOC for this new project.

Four developers work for four months on this project before system testing.

During system testing, 797 defects are discovered.

Assume that the system test of this new project is using the same amount of work as spent in the past

projects.

Based on this information only, which of the following statement is certainly true about this project?

K3 3 credits

A. The code for the new project contains a higher defect density than the code of the past projects

B. The number of defects found during the system test phase on the new project is approximately proportional to the development team effort

C. 40000 LOC have been delivered to system testing (against the 20000 LOC planned by the project manager)

D. More LOC than planned have been delivered to system testing with a higher defect density than the past projects

Show Answer
Questions 5

Consider the following list of statements about audits and management reviews:

I. Audits are usually more effective than management reviews at finding defects

II. Audits and management reviews have the same main goals, the only difference is related to the roles and level of formality

III. A typical outcome of an audit includes observations and recommendations, corrective actions and a pass/fail assessment

IV. An audit is not the appropriate mechanism to use at the code review in order to detect defects prior to dynamic testing

Which of the following statements is true?

K2 1 credit

A. I. and III. are true; II. and IV. are false;

B. II. and III are true; I. and IV. are false;

C. III. and IV. are true; I and II are false;

D. I, III and IV are true; II. is false;

Show Answer More Questions

Add Comments

Comment will be moderated and published within 1-4 hours

Success Stories

  • Turkey
  • Adair
  • Feb 21, 2024
  • Rating: 4.7 / 5.0

when i seat for exam, i found that some answers are in different order in the real exam.so you can trust this dumps.


  • Algeria
  • ZoZo
  • Feb 20, 2024
  • Rating: 4.4 / 5.0

Thanks a lot and good luck to everybody.


  • Egypt
  • Obed
  • Feb 19, 2024
  • Rating: 4.2 / 5.0

Nice study material, I passed the exam with the help of it. Recommend strongly.


  • India
  • zuher
  • Feb 16, 2024
  • Rating: 4.9 / 5.0

the content update quickly, there are many new questions in this dumps. thanks very much.


  • Pakistan
  • Lloyd
  • Feb 15, 2024
  • Rating: 4.3 / 5.0

this dumps is valid. All questions that I met in the exam are from this dumps !!!


  • India
  • Octavio
  • Feb 15, 2024
  • Rating: 4.5 / 5.0

Before attending the exam, I have studied every question and answer. when i seated for exam, I felt confident in every question. At last, I passed the exam with high score without doubt.Thanks for this valid dumps.


  • Singapore
  • Zy
  • Feb 14, 2024
  • Rating: 4.7 / 5.0

At first, I don’t think I can pass the ATM exam. But when I used this dumps, I felt more confident to pass the exam. It is not out of my expectation, i passed the exam with the full score because I met many same question that i have done in this dumps. Thanks these dumps, it is useful.


  • Egypt
  • Quennell
  • Feb 14, 2024
  • Rating: 4.7 / 5.0

The new questions in the exam are not the new questions for me because I have met them when I used this material . So there is no doubt that I have passed the exam with high score. Recommend this material strongly.


  • Philippines
  • Tax
  • Feb 14, 2024
  • Rating: 4.8 / 5.0

Today i pass the exam successfully .Thanks for this dumps. Recommend.


  • Hungary
  • Parker
  • Feb 13, 2024
  • Rating: 4.9 / 5.0

A valid dumps. It helped me pass the exam in short time. Thanks a million.


Download Free ISTQB ATM Demo

Experience Certbus exam material in PDF version.
Simply submit your e-mail address below to get started with our PDF real exam demo of your ISTQB ATM exam.

Instant download
Latest update demo according to real exam

*Email Address

* Our demo shows only a few questions from your selected exam for evaluating purposes