Certbus > SAP > SAP Application Associate > C_TPLM30_65 > C_TPLM30_65 Online Practice Questions and Answers

C_TPLM30_65 Online Practice Questions and Answers

Questions 4

A maintenance technician replaces a defective counter with a new counter.

Before the users can create a standard measuring document for the new counter, what step(s) must they perform?

A. Create a new technical object to represent the new measuring point.

B. Create a special measuring document and set the Counter Replacement indicator.

C. Dismantle the old measuring point and create a new measuring point.

D. Create a new measuring point and change the measuring point from which the measurement reading was transferred.

Browse 95 Q&As
Questions 5

Which of the following always produces up-to-the-minute costing information for maintenance orders?

A. A standard analysis from the Plant Maintenance Information System (PMIS)

B. A standard query in SAP Net Weaver Business Warehouse

C. A maintenance order list

D. A shift report based on shift notes

Browse 95 Q&As
Questions 6

You have selected Confirmation Required in the control key for operations in a maintenance order. One of the operations is already partially confirmed.

Which system statuses can the order header display before all operations are finally confirmed? (Choose three)

A. TECO

B. PCNF

C. CRTD

D. CNF

E. CLSD

Browse 95 Q&As
Questions 7

Your customer uses operating hours to execute a performance-based maintenance plan.

Which of the following data must you assign in the maintenance plan header?

A. A task list for performance-based maintenance

B. A cycle unit of measure with a corresponding characteristic from the measuring point

C. An order type for performance-based maintenance

D. A technical object with a measuring point

Browse 95 Q&As
Questions 8

SAP C_TPLM30_65 Exam

What does the functional location category determine? (Choose two)

A. Whether a fixed asset from Asset Accounting can be assigned

B. Whether you can create linear data for a functional location

C. The partner determination procedure

D. The functional location class

Browse 95 Q&As
Questions 9

Your customer wants the system to generate a serial number and an equipment master upon goods receipt of a material.

Which Customizing steps are required? SAP C_TPLM30_65 Exam

A. Create a serial number profile and assign it to an equipment master.

B. Create a serial number profile and assign it to a serializing procedure.

C. Create a serial number profile and assign it to a view profile for technical objects.

D. Create a serializing procedure and assign it to an equipment master.

Browse 95 Q&As
Questions 10

Your customer wants to create a component for maintenance that does not allow physical inventory.

Which material type must you use? SAP C_TPLM30_65 Exam

A. Spare parts (ERSA)

B. Maintenance assembly (IBAU)

C. Non-valuated materials (UNBW)

D. Operating supplies (HIBE)

Browse 95 Q&As
Questions 11

Which of the following steps are required to create a measuring point for performance-based preventive maintenance? (Choose two)

A. Specify the annual estimated usage for the measuring point.

B. Activate the Measurement Reading Transfer indicator.

C. Define a valuation code group.

D. Create the measuring point as a counter.

Browse 95 Q&As
Questions 12

When a user creates a task list using the Copy function, all the header fields transfer to the new task list, with one exception.

Which field is the exception?

A. Usage

B. Work Center

C. Assembly

D. Status

Browse 95 Q&As
Questions 13

When you create a refurbishment order, which reference objects can you use? (Choose three)

A. Functional location

B. Equipment without serial number

C. Material with serial number

D. Material without serial number E. Equipment with serial number

Browse 95 Q&As
Questions 14

Your customer uses the dynamic availability check for stock material.

Where does the system check material availability for an operation?

A. In all plants where material inventory exists

B. Only in the plant where the material has been reserved

C. Only in the plant where the material is flagged with the special stock indicator for maintenance stock

D. In all plants where the material is managed with serial numbers

Browse 95 Q&As
Questions 15

Users need to be able to select operations and work centers from the task list when they create a maintenance order with task list selection.

In Customizing, how can you accomplish this requirement? (Choose two)

A. By setting the indicators for the order type only

B. By setting the indicators for the planning plant only

C. By activating the work center selection indicator

D. By activating the operation selection indicator

Browse 95 Q&As
Questions 16

Which rule applies to user status in orders and notifications?

A. When you set a new user status with a status number, theprevious user status with status number is deactivated.

B. When a user status is flagged as an initial status, it overridesthe initial system status CRTD.

C. Every user, regardless of assigned authorizations, can assigna user status.

D. The user status in the notification can be copied into theorder.

Browse 95 Q&As
Questions 17

Your customer wants to assign maintenance orders to network activities automatically with the Maintenance Event Builder (MEB). Which of the following steps must you perform? (Choose two.)

A. Set the Define Transfer of Project or Invest Programindicator.

B. Assign maintenance orders manually to a revision withrevision type WPS-controlled.

C. Assign a network to a revision with revision type WPS-controlled.

D. Assign a hierarchical task list to a notification.

E. Assign the Reference PM/PS element to task list headers andnetwork activities.

Browse 95 Q&As
Questions 18

How are the planned costs for a refurbished part or parts displayed in the planned/actual order report?

A. As revenue with a positive value

B. As costs with a negative value

C. As revenue with a negative value

D. As costs with a positive value

Browse 95 Q&As
Exam Code: C_TPLM30_65
Exam Name: SAP Certified Application Associate - Enterprise Asset Management (Maintenance & Repair) with SAP ERP 6.0 EHP5
Last Update: Apr 28, 2024
Questions: 95 Q&As

PDF

$45.99

VCE

$49.99

PDF + VCE

$59.99