A cloud architect is writing an implementation plan for deployment of a clustered vRealize Automation deployment that will use a third-party load balancer.

Which two steps should the architect include within the implementation plan to ensure a successful deployment of vRealize Automation? (Choose two.)

A. Disable all secondary nodes from the load balancer pools

B. Create and configure the monitoring of vRealize Automation and vRealize Orchestrator

C. Ensure all the SAN certificates for vRealize Suite are available

D. Enable all non-primary nodes on the load balancer

E. Turn off the health monitors or change them temporarily to default to ICMP and ensure traffic is still forwarding to the primary node

Browse 60 Q&As
Questions 5

An online retail company needs its shopping cart application to be highly available.

What three cloud management design decisions would give an optimal shopping experience? (Choose three.)

A. Create a vRealize Operations metric chart for the application's CPU usage

B. Create a vRealize Orchestrator workflow that remediates the issue by updating the CPU

C. Configure the vRealize Operations alert to run a vRealize Orchestrator workflow when triggered

D. Create a vRealize Operations alert that is triggered when the application's CPU usage exceeds a threshold

E. Create a vRealize Orchestrator workflow that emails an administrator to remediate the issue

F. Configure the vRealize Operations alert to email an administrator to remediate the issue

Browse 60 Q&As
Questions 6

What level of design will contain an automation platform, an operational monitoring platform, and a desktop platform?

A. Physical Design

B. Conceptual Design

C. Detailed Design

D. Logical Design

Browse 60 Q&As
Questions 7

An organization that extensively uses vRealize Orchestrator workflows for vRealize Automation

integrations has the following challenges:

Each VM provisioning request executes 50 workflows for integration with various third-party tools.

Many developers from different teams, unaware of each other's work, create and maintain the workflows.

Whenever vRealize Automation VM deployments fail, a lot of time and resources are spent debugging

failures.

Which cloud management product will help speed up the organization's troubleshooting effects?

A. vRealize Operations Manager

B. vRealize Suite Lifecycle Manager

C. vRealize Log Insight

D. vRealize Network Insight

Browse 60 Q&As
Questions 8

A client wants to integrate a source control system to manage and maintain the cloud templates for their new installation of vRealize Automation.

Which solution should be included as part of the vRealize Automation logical design?

A. Git

B. Subversion

C. vRealize SaltStack Config

D. Gerrit

Browse 60 Q&As
Questions 9

What two statements are true about vRealize Operations Manager high availability (HA)? (Choose two.)

A. With HA, data stored in the primary node is partially backed up on the replica node.

B. Upon failure of the primary node, failover to the replica is automatic.

C. If the primary node fails, the replica node can take over all functions of the primary node.

D. To enable HA, you must deploy at least 3 data nodes, plus the primary node.

E. Data collection must be restarted from the administrative interface when the primary node fails.

Browse 60 Q&As
Questions 10

A customer will use the vRealize Automation platform for production and development deployments to the same vSphere cluster. One of their vSphere templates will only be licensed for use in development and must not be used for production.

The customer has defined a tag category called "environment" with three possible values "development", "test" and "production" to differentiate the environments.

Which two design decisions will ensure that the requirements are met? (Choose two.)

A. Define a tag of "environment:development" on the Cloud Zone

B. Define a tag of "!environment:production" on the licensed image mapping

C. Define a tag of "environment:development" on the licensed image mapping

D. Define a tag of "environment:development" in all development Cloud Templates

E. Define a tag of "environment:production" on the Cloud Zone

Browse 60 Q&As
Questions 11

A customer is deploying vRealize Log Insight (vRLI) in their data centers. The customer has the following:

Three data centers in three geographical locations.

Each site has 1000 logging sources that send events to vRLI.

The customer has the following requirements:

Minimize the resources footprint in the management cluster where vRLI will be deployed.

vRLI must be highly available with no single points of failure.

Logs collected from any data center must be protected against site failure.

Which three design decisions would the architect choose to achieve the requirements? (Choose three.)

A. Configure logs forwarding from all data centers to a specific data center.

B. Configure filters to eliminate forwarding loops between vRLI clusters.

C. Configure logs forwarding from each data center to another one.

D. Deploy nine vRLI "Medium" nodes in a single cluster in each data center.

E. Configure filters to forward critical logs to central vRLI cluster.

F. Deploy four vRLI "Large" nodes in a single cluster in each data center.

Browse 60 Q&As
Questions 12

An architect is responsible for creating a new design to centralize the logging infrastructure for an existing

vSphere environment. The key stakeholder in the project has provided the following list of requirements:

The management solution must forward all logs to the existing centralized Security Incident and Event

Management (SIEM) solution.

The management solution must be a minimum of N + 1 resilient.

The management solution must provide the ability to view at least 2 months of live data.

The management solution must meet a monthly uptime SLA of 99.9%.

The management solution must support the collection of logs from ten geographically separated data

center locations.

The management solution must support the collection of a minimum of 10,000 events per second.

Given the information from the stakeholder, which two statements would be considered functional

requirements? (Choose two.)

A. The management solution must be a minimum of N + 1 resilient.

B. The management solution must meet a monthly uptime SLA of 99.9%.

C. The management solution must provide the ability to view at least 2 months of live data.

D. The management solution must forward all logs to the existing centralized Security Incident and Event Management (SIEM) solution.

E. The management solution must support the collection of a minimum of 10,000 events per second.

Browse 60 Q&As
Questions 13

Which two statements are true when considering the vRealize Automation logical design for workload storage placement based on service levels, cost, and performance? (Choose two.)

A. Secondary disk attached to the virtual machine resource use the same storage constraint tag as the virtual machine

B. Storage constraint tag is applied to virtual machine resource and all the disks associated with the template

C. vSphere tags can only be used in storage profiles

D. Storage placement is independent of vendor when using hard constraint tags

E. First class disks are only supported in vRealize Automation Cloud

Browse 60 Q&As
Questions 14

A company has recently completed an audit and has found that there are many virtual machines in their production environment which no longer appear to be in use. To prevent this from happening in future, the company is deploying vRealize Automation and would like all provisioned VMs to meet following requirements:

VMs to have a default lease of 90 days and no more than 365 days Lease policy can be overridden on case by case basis Upon initial lease expiry, the VM should be kept for 10 days after which they will be destroyed

Which policy design will meet the technical requirements?

A. Create a lease policy with the organization scope, setting 90 days lease, 365 total lease and grace period to 10 and a hard enforcement

B. Create a lease policy with the organization scope, setting 90 days lease, 365 total lease and grace period to 10 and a soft enforcement

C. Create a lease policy with the project scope, setting 90 days lease, 365 total lease and grace period to 10 and a soft enforcement

D. Create a lease policy with the project scope, setting 90 days lease, 365 total lease and grace period to 10 and a hard enforcement

Browse 60 Q&As
Questions 15

A customer has asked to have a vSphere cluster and Cloud Zone dedicated for Cloud Template development. The customer is going use the Cloud.vSphere.Machine compute resource type and they have been unable to quantify values for Favor Mappings during a requirements gathering exercise.

Which Flavor Mapping decision should be made for the Cloud Zone?

A. Create multiple Flavor Mappings with incremental sizes

B. Flavor Mappings are not needed for the vSphere Cloud Zone

C. Create a single Flavor Mapping with a modest size

D. Create a single Flavor Mapping with the maximum size supported by vSphere

Browse 60 Q&As
Questions 16

A healthcare company has mandated that all IP and DNS entries be allocated from an existing third-party IPAM solution. Also, for auditing purposes, all systems must handle user authentication via the existing open source LDAP directory.

When considering a logical design for this scenario, which is true about the dependency relationships of these systems?

A. The IPAM system is an upstream dependency and the LDAP system is a downstream dependency of vRealize Automation.

B. Both the IPAM and LDAP systems are external, upstream dependencies of vRealize Automation.

C. Both the IPAM and LDAP systems are external, downstream dependencies of vRealize Automation.

D. The LDAP system is an upstream dependency and the IPAM system is a downstream dependency of vRealize Automation.

Browse 60 Q&As
Questions 17

An architect is designing a greenfield Cloud Management solution. During the requirements gathering workshop with the customer, the following information was captured:

The log monitoring solution must be capable of collecting a minimum of 10,000 evets per second. The automation solution must be capable of deploying at least 20 concurrent workloads.

When creating the design documentation, which design quality should be used to classify the requirements?

A. Availability

B. Manageability

C. Performance

D. Recoverability

Browse 60 Q&As
Questions 18

A cloud architect is planning to scale out the small deployment of vRealize Automation to address high availability requirements.

When creating an implementation plan, which prerequisite should be documented?

Note: FQDN: Fully qualified domain name VIP: Virtual IP address

A. Request certificate containing VIP FQDN for each Organization for VMware Identity Manager VIP

B. Request Certificate Authority (CA)-signed certificate containing the VIP FQDN and the FQDN of the VMware Identity Manager nodes

C. Request Certificate Authority (CA)-signed certificate containing the VIP FQDN and the FQDN of all the cluster nodes

D. Request certificate containing VIP FQDN for each Organization for vRealize Automation VIP

Browse 60 Q&As
Exam Code: 3V0-32.21
Exam Name: Advanced Design VMware Cloud Management and Automation
Last Update: May 01, 2024
Questions: 60 Q&As

PDF

$45.99

VCE

$49.99

PDF + VCE

$59.99