Questions 4

A Work Center created a month ago is no longer in use now. You want to remove the Work Center;

however, the system is no allowing you to delete it.

Identify three reasons for this.

A. There are resources associated with the Work Center.

B. The Work Center is being referenced in the Closed Work Order.

C. The Work Center is being referenced in the Open Work Order.

D. The work center is being references in the work definition operation.

E. The work center is being referenced in the Work Area.

Browse 66 Q&As
Questions 5

In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an assembly have been defined as required. A cost accountant created different scenarios to represent different manufacturing and cost assumptions and compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the cost scenario to cost accounting. Identify three process steps that the cost accountant has to perform to transfer the assembly to cost accounting in frozen type.

A. Publish cost planning scenario to Accounting.

B. Build cost planning scenario and perform cost roll up.

C. Create Accounting Distributions.

D. Transfer transactions from production to Costing.

E. Define a cost planning scenario with Material, Resource, Overhead cost plans, and work definition.

F. Transfer Transactions from Inventory to Costing.

Browse 66 Q&As
Questions 6

Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.

A. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).

B. Set the global sourcing rule in GOP to determine supply creation option as Make.

C. Set a local sourcing rule in GOP to determine supply creation option as Make.

D. Create Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item.

E. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item.

Browse 66 Q&As
Questions 7

You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report production exception and who gets notified after an exception is raised?

A. The Production Operator can report and exception and the application generates a notification that is

sent to all users who have access to the manufacturing plant.

B. The Production Operator can report an exception and the application generates a notification that is sent to all users with the role of production supervisor who have access to the manufacturing plant.

C. The Production Operator or Manufacturing Engineer can report an exception and notifies the production supervisor using Oracle Social Network since there is no system generated notification.

D. The Production Operator can report an exception and notifies the production supervisor using Oracle Social Network since there is no system-generated notification.

Browse 66 Q&As
Questions 8

Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.

A. There are no components attached to it.

B. The Automatically Transact check box is deselected.

C. The Automatically Transact check box is selected.

D. The Count Point check is selected.

E. The Count Point check box is deselected.

Browse 66 Q&As
Questions 9

The Manufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day and Night Shift. Identify the correct sequence of steps to achieve this requirement.

A. Associate Resource R2 with Work Center WC1> Select Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.

B. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift Column

C. Associate Resource R2 with Work Center WC1> Select the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift Column.

D. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.

Browse 66 Q&As
Questions 10

Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and

resources available in the spreadsheet.

Which two operations are not supported using ADFDI (Oracle Application Development Framework

Desktop Integration)?

A. Create Work Definitions

B. Update Work Definitions

C. Create and update ATO (Assemble To Order) model work definitions

D. Populate Descriptive flexfields

Browse 66 Q&As
Questions 11

The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, has scheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes. Which two reasons could cause this?

A. The engineer does not have Data access to Items Attributes.

B. The engineer does not have Data access to Items.

C. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was performed.

D. The engineer does not have Data access to Item Structures.

E. The engineer does not have the Manage Work Definitions function privilege.

Browse 66 Q&As
Questions 12

Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days. A plan is run and the Work Order WO-2045 is rescheduled. Identify the duration of the rescheduled Work Order WO- 2045.

A. Rescheduled Work Order WO-2045 duration = 2 days

B. Rescheduled Work Order WO-2045 duration = 1.25 days

C. Rescheduled Work Order WO-2045 duration = 3.25days

D. Rescheduled Work Order WO-2045 duration = 0.75 days

Browse 66 Q&As
Questions 13

Identify three requirements fulfilled by nonstandard work orders.

A. Rescheduling

B. Repair

C. Rework

D. Prototype

Browse 66 Q&As
Questions 14

Identify the two capabilities that the Application Development Framework Desktop Integration (ADFDI) framework provides for Work Definitions in Manufacturing Cloud.

A. You can mass create and update work definitions and their operations, items, and resources.

B. You can mass create and update work definitions and their operations, items only and cannot add resources in work definitions.

C. You can mass create and update work definitions and their operations only and cannot add items and resources in work definitions.

D. You can copy work definitions form one organization to another organization.

Browse 66 Q&As
Questions 15

As a production supervisor, you require immediate access to critical shop floor execution systems to take

action while on the go.

Which four work order related actions can be taken in the Manufacturing Supervisor mobile application?

A. Executing standard work order and updating item and resource usage

B. Creating a new standard or non standard work order

C. Searching for work orders and sending them through e-mail

D. Releasing work orders using quick swipe details

E. Reviewing operation, component, and resource detail

F. Reviewing customer information of work orders

Browse 66 Q&As
Questions 16

In what three ways can you set the overcompletion tolerance for a subcomponent yield, so the job order can report the excess production completion?

A. Overcompletion Tolerance Type = Amount, value > 0

B. Overcompletion Tolerance Type = Amount, value = 0

C. Overcompletion Tolerance Type = Percentage, value = 100

D. Overcompletion Tolerance Type = Percentage, value > 0

E. Overcompletion Tolerance Type = Percentage, value = 0

Browse 66 Q&As
Questions 17

The production user wants to report Work Order completion. Identify two ways of reporting the progress of work order at work order operation level.

A. Change Move status to Ready.

B. Complete using quantity completion

C. Complete with Details

D. Quick Complete

E. Change status of Operation to completed

Browse 66 Q&As
Questions 18

A Production operator in your company is required to report production activities, such as completing or

scrapping production units, by referencing a work definition without creating work orders.

Identify the manufacturing transaction that a production operator can perform for reporting such activities.

A. Orderless Transactions

B. Operation Transactions

C. Resource Transactions

D. Movement request

E. Material Transactions

Browse 66 Q&As