1Z0-1075-20 Dumps

  Printable PDF

  Unencrypted VCE

Oracle 1Z0-1075-20 dumps - 100% Pass Guarantee!

Rating: 5.0

Vendor: Oracle

Certifications: Supply Chain Management (SCM)

Exam Name: Oracle Manufacturing Cloud 2020 Implementation Essentials

Exam Code: 1Z0-1075-20

Total Questions: 66 Q&As ( View Details)

Last Updated: Apr 16, 2024

Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $45.99 VCE Only: $49.99 VCE + PDF: $59.99

PDF

  • Q&As Identical to the VCE Product
  • Windows, Mac, Linux, Mobile Phone
  • Printable PDF without Watermark
  • Instant Download Access
  • Download Free PDF Demo
  • Includes 365 Days of Free Updates

VCE

  • Q&As Identical to the PDF Product
  • Windows Only
  • Simulates a Real Exam Environment
  • Review Test History and Performance
  • Instant Download Access
  • Includes 365 Days of Free Updates

Oracle 1Z0-1075-20 Last Month Results

761
Successful Stories of Oracle 1Z0-1075-20 Exam
96.8%
High Score Rate in Actual Oracle Exams
91.5%
Same Questions from the Latest Real Exam
  • 96.8% Pass Rate
  • 365 Days Free Update
  • Verified By Professional IT Experts
  • 24/7 Live Support
  • Instant Download PDF&VCE
  • 3 Days Preparation Before Test
  • 18 Years Experience
  • 6000+ IT Exam Dumps
  • 100% Safe Shopping Experience

1Z0-1075-20 Q&A's Detail

Exam Code: 1Z0-1075-20
Total Questions: 66
Single & Multiple Choice 66

1Z0-1075-20 Online Practice Questions and Answers

Questions 1

Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.

A. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).

B. Set the global sourcing rule in GOP to determine supply creation option as Make.

C. Set a local sourcing rule in GOP to determine supply creation option as Make.

D. Create Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item.

E. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item.

Show Answer
Questions 2

A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day. Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.

A. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.

B. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units in Default Availability column.

C. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.

D. Click Outside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4 units in Availability Override column.

Show Answer
Questions 3

An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product. Which seeded job role must this employee be provided with?

A. Manufacturing Engineer

B. Production Engineer

C. Production Operator

D. Manufacturing Supervisor

E. Production Supervisor

Show Answer
Questions 4

You are reviewing the production status of your manufacturing plant shop floor as a production supervisor. Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized. Which option shows the steps to complete the task using the mobile application?

A. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page > Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.

B. Select the infotile Customer to open the work order details page> Click Actions and select the E- mail icon> Select required work orders>Select the e-mail client, enter the recipient's e-mail, and click Send.

C. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page> Select required work orders> Click Social icon (OSN) > Select recipient, and click Share.

D. Search the work order by customer name to open the work order details page> Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's email, and click Send.

Show Answer
Questions 5

Identify the three changes that are allowed to be made to active Work Definition in a Work Center, without creating a new version.

A. Delete an Operation

B. Costing Priority

C. Production Priority

D. Add an Operation

E. Completion Subinventory

Show Answer More Questions

Add Comments

Comment will be moderated and published within 1-4 hours

Success Stories

  • Kazakhstan
  • Marlin Erick
  • Apr 22, 2024
  • Rating: 5.0 / 5.0

I studied this dumps, took some online trainings. At last I pass my exam today.


  • Mongolia
  • Sam
  • Apr 21, 2024
  • Rating: 4.3 / 5.0

Today i passed the exam, This dumps is valid exactly. Please read all of theory and then use this dumps.


  • Sault Au Mouton
  • Robert
  • Apr 19, 2024
  • Rating: 5.0 / 5.0

I'm sure this dumps is valid. I check the reviews on the internet and finally choose their site. The dumps proved I made my decision correctly. I passed my exam and got a pretty nice result. I prepare for the 200-310 exam with the latest 400+Qs version. First, I spend about one week in reading the dumps. Then I check some questions on the net. This is enough for you if you just want to pass the exam. Register in a relevant course if you have enough time. Good luck!


  • Cambodia
  • William
  • Apr 18, 2024
  • Rating: 4.8 / 5.0

Yes, i have passed the exam by using this dumps,so you also can try it and you will have unexpected achievements. Recommend to all.


  • India
  • Marvin
  • Apr 18, 2024
  • Rating: 5.0 / 5.0

This is the best study material I have used ,and I will continue using it when I have exam. Believe me,you can trust on it.


  • Philippines
  • Zhi
  • Apr 17, 2024
  • Rating: 4.1 / 5.0

Thanks for your help I pass my 1Z0-1075-20 exam. I will be your regular customer and recommend you to all my colleagues.


  • United Kingdom
  • Baker
  • Apr 16, 2024
  • Rating: 4.1 / 5.0

hi guys , i passed this exam today. Really thanks for this dumps,Recommend strongly.


  • London
  • Kelly
  • Apr 16, 2024
  • Rating: 5.0 / 5.0

This resource was colossally helpful during my 1Z0-1075-20 studies. The practice tests are decent, and the downloadable content was great. I used this and two other textbooks as my primary resources, and I passed! Thank you!


  • Indonesia
  • Ravi
  • Apr 15, 2024
  • Rating: 4.3 / 5.0

Valid study material! Go get it now!!!


  • United States
  • Roger
  • Apr 14, 2024
  • Rating: 5.0 / 5.0

As for me , this dumps is very useful and convenient, I can find my disadvantages easily and know how to correct them. I also can learn new skills and knowledge by using this dumps. I think you also can do it. I have test it so you can trust on it.