1Z0-520 Questions and Answers

  Printable PDF

Oracle E-Business Suite R12.1 Purchasing Essentials: 1Z0-520

Rating: 4.9

Vendor: Oracle

Certifications: On-Premise Applications

Exam Name: Oracle E-Business Suite R12.1 Purchasing Essentials

Exam Code: 1Z0-520

Total Questions: 285 Q&As

Last Updated: Mar 26, 2023

Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $45.99 VCE Only: $49.99 VCE + PDF: $59.99

Oracle 1Z0-520 PDF&VCE Dumps Download

  • 99.5% Pass Rate
  • 365 Days Free Update
  • Verified By Professional IT Experts
  • 24/7 Live Support
  • 378,380+ Satisfied Customers
  • 3 Days Preparation Before Test
  • 18 Years Experience
  • 6000+ IT Exam Dumps
  • 100% Safe Shopping Experience

Oracle 1Z0-520 Last Month Results

392
Successful Stories of Oracle 1Z0-520 Exam
97.7%
High Score Rate in Actual Oracle Exams
92.5%
Same Questions from the Latest Real Exam

1Z0-520 Online Practice Questions and Answers

Questions 1

Price Tolerance (%) on the Purchasing Options Control section refers to the percentage by which ___________.

A. the purchase order line price cannot exceed a price quote

B. the invoice price cannot exceed the purchase order line price

C. the purchase order line price cannot exceed the blanket amount

D. the supplier catalog price cannot exceed purchase order line price

E. the purchase order line price cannot exceed the requisition line price

Show Answer
Questions 2

Your customer has two manufacturing plants. The manufacturing process for both the plants is identical, but there are differences in specific areas.

1.

Plant 1 uses min-max planning and Plant 2 uses re-order point planning.

2.

Plant 1 and Plant 2's Variable Lead Times are different.

3.

Plant 1 and Plant 2 use two different WIP (Work In Process) supply subinventories.

Which two attribute control settings meet the requirement? (Choose two.)

A. Organization Level: WIP Supply Subinventory

B. Master Level: Stockable, Transactable, Build in WIPOrganization Level: Inventory Planning Method

C. Organization Level: Variable Lead Time, WIP Supply Subinventory

D. Master Level: Stockable, Variable Lead Time, Inventory Planning Method Organization Level: Transactable

E. Master Level: Transactable, Inventory Planning Method, Variable Lead Time

F. Master Level: WIP Supply Subinventory, Variable Lead Time, Stockable, Transactable, Build in WIP

Show Answer
Questions 3

You completed an inventory transaction and a work-in-process transaction. Then you checked the on-hand quantity and found that both the inventory and work-in-process transactions were not processed. Which manager is responsible for processing quantity-based transactions?

A. cost transaction manager

B. move transaction manager

C. material transaction manager

D. lot move transaction manager

Show Answer More Questions

Success Stories

Marvin

  • India
  • Mar 28, 2023
  • Rating: 5.0 / 5.0

This is the best study material I have used ,and I will continue using it when I have exam. Believe me,you can trust on it.


zisa

  • Singapore
  • Mar 28, 2023
  • Rating: 4.1 / 5.0

Valid study material.Recommend strongly.


Olsen

  • United States
  • Mar 27, 2023
  • Rating: 4.9 / 5.0

One of my friends told me that the {sku} dumps on this site are good and I purchased it. Great. I passed my exam with it. Nice work, guys.


ZoZo

  • Algeria
  • Mar 27, 2023
  • Rating: 4.4 / 5.0

Thanks a lot and good luck to everybody.


Rossie

  • Russian Federation
  • Mar 26, 2023
  • Rating: 4.1 / 5.0

very good study material.


Zotac

  • Philippines
  • Mar 26, 2023
  • Rating: 4.7 / 5.0

I'm very happy that I have passed the {sku} exam with high score. I will share this good dumps with my friend. You can trust on it.


Walls

  • Egypt
  • Mar 25, 2023
  • Rating: 4.2 / 5.0

I love this dumps. It really helpful and convenient. Recommend strongly.


Tax

  • Philippines
  • Mar 24, 2023
  • Rating: 4.8 / 5.0

Today i pass the exam successfully .Thanks for this dumps. Recommend.


Rudy

  • India
  • Mar 24, 2023
  • Rating: 4.5 / 5.0

Thanks for your help. I passed my exam yesterday with a high score. I think you have the great dumps. all my questions are from your materials. I'm very happy with that. Thanks.


Levi

  • South Africa
  • Mar 21, 2023
  • Rating: 4.3 / 5.0

I only used this dumps and my book. I passed the exam with high score surprisingly. Really thanks for this valid dumps.


Download Free Oracle 1Z0-520 Demo

Experience Certbus exam material in PDF version.
Simply submit your e-mail address below to get started with our PDF real exam demo of your Oracle 1Z0-520 exam.

Instant download
Latest update demo according to real exam

*Email Address

* Our demo shows only a few questions from your selected exam for evaluating purposes