Certbus > Avaya > ACIS > 3605 > 3605 Online Practice Questions and Answers

3605 Online Practice Questions and Answers

Questions 4

A technician is configuring an InterSwitch Frank (IST) for Spilt Multi-Link Franking (SMLT). Which statement about how the IST is addressed is true?

A. Configure the IP address of the ports that comprise the IST.

B. No address configurations are required when configuring an IST.

C. Configure the IP address of the VLAN that was created for the IST.

D. Configure the MAC addresses of the switches on each end of the IST.

Browse 173 Q&As
Questions 5

A split Multi-Link Trunking (SMLT) for switch clustering is being configured. Which statement is a configuring requirement for the SMLT?

A. CP-Limit is configured on edge switch stacks.

B. Neighboring edge switch stacks should be connected to each other via a DMLT connection to add resilent paths in the event of an SMLT failure.

C. Alternate the primary paths of the SMLT connection to load balance the switch core.

D. VLANs that are defined on the SMLT are also defined on the MLT that defines the core inter Switch Trunks (IST).

Browse 173 Q&As
Questions 6

Which VLAN/VLANs should be included on the Inter Switch Trunks (IST) for a proper functioning split Multi-Link (SMLT) configuration?

A. Only VLAN 101

B. Only VLAN 1 and the IST

C. Only the VLANs that are also included on the SMIT/SLT uplinks3

D. The IST VLAN and all the VLANs that are included on all SMLT/SLT links

Browse 173 Q&As
Questions 7

To confirm that routed split Multi-Link Trunking (RSMLT0 will work on a set of VLANs, which network design aspect should be considered?

A. RSMLT is enabled on each SMLT VLAN on which the function is required.

B. RSMLT is enabled on the VLAN group.

C. Router 1 always owns the network.

D. RSMLT is enabled on all SMLT VLANs.

Browse 173 Q&As
Questions 8

After issuing a show mit ist stats (CLI) or show ist stat (ACLI) command, it is determined that running type is normal MLT and not Inter Switch Trunks (IST). Which are two causes of the 1ST not running properly? (Choose two.)

A. The 1ST is not enabled on both switches.

B. The MLT ID does not match on both switches.

C. The peer IP address is not the address of the peer switch 1ST VLAN

D. The peer IP addresses have to be 192.168.1.1/30 and 192.168.1.2/30.

Browse 173 Q&As
Questions 9

A customer has purchased some Ethernet Routing Switch (ERS) 5600 switches must integrate two ERS 5600 units into existing stack of ERS 5500 switches. What is the procedure for the integration of the new ERS 5600?

A. with power applied to the slack, change the existing ERS 5500 base unit to "Non Base Unit" in mixed stack operation Integrate the two new ERS 5600 to the stack with them set as "Base Unit" in mixed stack operation Reboot the stack.

B. Remove the AC from the stack, integrate the two ERS 5600 units into the existing 5600 set to "base unit" and one ERS 5600 set to "non base unit" set the existing ERS 5500 base unit to "non base unit" apply power to stack.

C. With power applied to the stack, integrate one ERS into the stack as non base unit in mixed stack operational mode. Change the existing ERS 5500 base unit to "non base unit" and set the new 5600 to "base unit". Reboot the stack integrate the second ERS 5600 in mixed stack operational mode.

D. With power applied to the stack, integrate one ERS into the stack as non base unit in mixed stack operational mode. After the two ERS 5600 units have obtained their configuration from the ERS 5500 base unit, change the ERS 5500 to "non base unit" and set one ERS 5600 to "base unit". Reboot the switch stack.

Browse 173 Q&As
Questions 10

A technician has installed a license file on the Ethernet routing switch (ERS) 8800 and rebooted, but cannot configure the associated licensed features. it has been determined that license did not load properly at booyup time.

Which two must be verified?

A. The switch is at the current release.

B. The license filename contains valid characters.

C. The license file is stored in the flash directory

D. The appropriate license level has been obtained.

E. The license file has .dat extension.

Browse 173 Q&As
Questions 11

Click the exhibit button.

SLPP has just been enabled on both core switches.

Based on the network diagram and console output from the core 1 Ethernet Routing Switch (ERS) B600 shown in the exhibit, what is the configuration error on the

edge switch?

A. The edge switch spanning-trcc has not been configured.

B. The edge switch access port rate limiting has not been configured.

C. The edge MLT has not been configured correctly.

D. The edge VUXNs has not been configured.

Browse 173 Q&As
Exam Code: 3605
Exam Name: Avaya Ethernet Routing Switch Implementation and Maintenance Exam
Last Update: Apr 28, 2024
Questions: 173 Q&As

PDF

$45.99

VCE

$49.99

PDF + VCE

$59.99