Questions 4

Where can you define the valid receivers for production order costs?

A. In the valuation variant

B. In the production scheduling profile

C. In the settlement profile

D. In the costing variant

Browse 80 Q&As
Questions 5

In what sequence are the steps of material requirements planning performed in SAP ECC?

A. 1. Net requirements calculation

2.

Lot sizing

3.

Scheduling

4.

Determination of the procurement type

B. 1. Calculation of safety stock

2.

Lot sizing

3.

Scheduling

4.

Determination of the procurement type

C. 1. Net requirements calculation

2.

Lot sizing

3.

Determination of the procurement type

4.

Scheduling

D. 1. Availability check

2.

Lot sizing

3.

Determination of the procurement type

4.

Scheduling

Browse 80 Q&As
Questions 6

In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:

-Start: 7:00:00 a.m.

-End: 3:00:00 p.m.

-Break duration: 1 hour

-Rate of utilization: 80%

-Overload: 110%

-Number of individual capacities: 1

How large is the standard available capacity?

A. 7 hours

B. 6.16 hours

C. 5.6 hours

D. 8 hours

Browse 80 Q&As
Questions 7

Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order.

Which BOM item category must you set to fulfill this requirement?

A. D (document item)

B. M (phantom material)

C. N (non-stock item)

D. E (external procurement)

Browse 80 Q&As
Questions 8

Which of the following properties applies to multi-site planning in SAP ECC?

A. Multi-site planning can be activated using the corresponding planning strategy.

B. Both withdrawal from alternative plant and stock transfer from another plant are defined via special procurement keys.

C. The use of "scope of planning" (cross-plant total planning) is mandatory for multi-site planning.

D. When using one-step stock transfer posting, transfer stock is created in the receiving plant.

Browse 80 Q&As
Questions 9

You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you should be able to use a second sequence on other work centers for operations 30 and 40.

What sequence category do you use to create the second sequence in the system?

A. Substitute sequence

B. Standard sequence

C. Alternative sequence

D. Parallel sequence

Browse 80 Q&As
Questions 10

You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a dynamic safety stock in SAP ECC.

On which specifications is the dynamic safety stock calculation based?

A. The average daily demand and the desired days supply

B. The static safety stock and the material forecast

C. The static safety stock per day and the safety time

D. The average daily demand and the safety time

Browse 80 Q&As
Questions 11

Which of the following requirements is supported by using process orders?

A. Linkage of documents to orders

B. Use of reference operation sets

C. Use of production/resource tools

D. Documentation of the production using an electronic batch record

Browse 80 Q&As
Questions 12

You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.

What do you have to consider in this scenario?

A. Planned orders that are created by requirements planning are shifted to the end of the planning time fence.

B. Requirements planning considers only changes that are relevant for scheduling within the planning time fence.

C. The MRP controller cannot create planned orders within the planning time fence.

D. Planned orders are created within the planning time fence and automatically firmed by requirements planning.

Browse 80 Q&As
Questions 13

Which of the following statements about ATP (Available To Promise) checks for material components are correct? (Choose two)

A. ATP checks are automatically performed during Material Requirements Planning (MRP) runs.

B. ATP checks are used to evaluate the free capacity on a certain work center.

C. ATP checks can be adjusted to also consider future requirements and receipts.

D. ATP checks can be carried out automatically when releasing a production order.

E. ATP checks are mandatory for lead-time scheduling.

Browse 80 Q&As
Questions 14

You want to send production order-related data like confirmations, goods receipts, goods issues, and other user-specific actual data from an external process control system to SAP ECC.

How can you fulfill this requirement?

A. Use the core interface (CIF).

B. Use the service application interface (SAPI).

C. Use the PI-PCS interface.

D. Use the PP-PDC interface.

Browse 80 Q&As
Questions 15

Which of the following items of master data are needed for repetitive manufacturing? (Choose three)

A. Product cost collector

B. Repetitive manufacturing profile

C. Production version

D. Production supply area

E. Master record for serial numbers

Browse 80 Q&As
Questions 16

Which of the following features are offered by MRP areas in SAP ECC? (Choose two)

A. An MRP area may include different storage locations.

B. Subcontracting is supported by MRP areas.

C. Make-to-order production is supported by storage location MRP areas.

D. A storage location may be assigned to different MRP areas.

Browse 80 Q&As
Questions 17

You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling).

Which of the following statements is true for the resulting dependent requirements?

A. When a customer order is created for the finished material, the dependent requirements are automatically triggered for the components in the bill of material without a planning run.

B. In multi-level backward scheduling, dependent requirements are calculated to the exact second.

C. In multi-level backward scheduling, dependent requirements are triggered at the start date for the planned order of the finished material.

D. If the individual material components are explicitly assigned to the operations of a routing, the requirement dates of the dependent requirements are scheduled at each start date of the operations.

Browse 80 Q&As
Questions 18

You want to enhance the system statuses of a production order with user statuses.

How do you do this?

A. Define a status profile in Customizing and assign it to the production scheduling profile.

B. Define the user statuses in the Customizing table of the system statuses.

C. Define the user statuses in the order type-dependent parameters.

D. Define a status profile in Customizing and assign it to the order type.

Browse 80 Q&As
Exam Code: C_TSCM42_65
Exam Name: SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP5
Last Update: Apr 13, 2024
Questions: 80 Q&As

PDF

$45.99

VCE

$49.99

PDF + VCE

$59.99