Certbus >ISQI>ISQI Certifications>CTAL-TM_SYLL2012
CTAL-TM_SYLL2012 Questions and Answers

  Printable PDF

ISQI CTAL-TM_SYLL2012 dumps - 100% Pass Guarantee!

Rating: 4.7

Vendor: ISQI

Certifications: ISQI Certifications

Exam Name: ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012]

Exam Code: CTAL-TM_SYLL2012

Total Questions: 64 Q&As

Last Updated: Sep 24, 2023

Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $45.99 VCE Only: $49.99 VCE + PDF: $59.99

ISQI CTAL-TM_SYLL2012 PDF&VCE Dumps Download

  • 99.5% Pass Rate
  • 365 Days Free Update
  • Verified By Professional IT Experts
  • 24/7 Live Support
  • Instant Download PDF&VCE
  • 3 Days Preparation Before Test
  • 18 Years Experience
  • 6000+ IT Exam Dumps
  • 100% Safe Shopping Experience

ISQI CTAL-TM_SYLL2012 Last Month Results

847
Successful Stories of ISQI CTAL-TM_SYLL2012 Exam
96.3%
High Score Rate in Actual ISQI Exams
91.1%
Same Questions from the Latest Real Exam

CTAL-TM_SYLL2012 Online Practice Questions and Answers

Questions 1

You are the Test Manager for a project to develop a client-server application that allows wine vendors to order custom-assorted packages of wines of several winemakers to sell special packages in their wine shops.

You decide to apply a blended risk-based and reactive testing strategy. Below the exit criteria for the system testinG.

EXCR1- Each "critical" quality risk item must be covered by at least one test condition

EXCR2- Each "critical" requirement must be covered by at least one test condition

The following are the "critical" requirements of the application:

REQ-SEL-1. The application shall allow the user to order only one package at a time

REQ-SEL-2. The application shall allow the user to select between four different packages (2- bottles, 6-bottles, 12-bottles, 15-bottles)

REQ-SEL-3. The application shall allow the user to order a package containing at least 1 bottle and no more bottles than the package size. No error messages shall be displayed if the user selects a valid number of bottles (at least 1 bottle

and no more than the package size)

REQ-SEL-4. The application shall display an error message "Invalid number of bottles" if an invalid number of bottles is selected by the user (zero bottles or a number higher than the package size)

REQ-PAY-1. The application shall allow the user to pay with the three accepted credit cards (Visa, MasterCard, American Express)

REQ-PAY-2. The application shall display an error message "Invalid credit card" if invalid credit card data are given by the user

The following is the unique "critical" quality risk item that has been identified:

CR-RSK-1. The GUI of the application might accept non-integer values for the input field designed to get the number of bottles from the user

Test analysis for system testing has just begun and the following test conditions have been identified.

TC-SEL-2. Test the selection of the package sizes

TC-SEL-4. Test wrong numbers of bottles for an order

TC-CR-RSK-1. Test the accepted values from the input field designed to get the number of bottles from the user

What is the MINIMUM number of test conditions that must be added to fulfill both the EXCR1 and EXCR2 exit criteria?

A. 4

B. 3

C. 2

D. 1

Show Answer
Questions 2

Based on the historical data of 5 past and similar projects, you have calculated these average numbers of defects detected in system testinG.

-

For each 10000 LOC (lines of code), 200 defects

-

For each person-month of development team effort, 49 defects

You want to use this information to perform estimation for a new project.

The project manager tells you that he/she has estimated 20000 new LOC for this new project.

Four developers work for four months on this project before system testing.

During system testing, 797 defects are discovered.

Assume that the system test of this new project is using the same amount of work as spent in the past projects.

Based on this information only, which of the following statement is certainly true about this project?

A.

The code for the new project contains a higher defect density than the code of the past projects

B.

The number of defects found during the system test phase on the new project is approximately proportional to the development team effort

C.

40000 LOC have been delivered to system testing (against the 20000 LOC planned by the project manager)

D.

More LOC than planned have been delivered to system testing with a higher defect density than the past projects

Show Answer
Questions 3

You are the Test Manager on a project following an iterative life-cycle model. The project should consist of nine iterations of one month duration each. It is planned to develop the most important features to have a stable core of the application in the first three iterations and to add the additional features in the last six iterations.

At the beginning of the first iteration, only a draft version of the requirements specification document for the core features is available. Assume that during each of the first three iterations, the chosen features are fully completed and unit tested.

Which of the following statements is true in this context?

A. The system test phase should start when all the requirements are frozen

B. You should allocate a large effort for system testing during the first three iterations

C. You should allocate all the effort for the system test phase only in the last iteration

D. You should apply the same test strategy as used in a sequential life cycle model

Show Answer More Questions

Success Stories

Quirita

  • New Zealand
  • Sep 28, 2023
  • Rating: 4.5 / 5.0

This dumps was introduced by my good friend several month ago. At first, I don't think it will help me a lot. But when I found many new questions that I never found from other study materials, i begun to pay more attention on this dumps. At last, I only used this dumps for preparing my exam. A moment ago, i have cleared that i passed the exam with almost full score. Thanks for this dumps, i will recommend to others just as my friend do.


saini

  • Australia
  • Sep 27, 2023
  • Rating: 4.9 / 5.0

i really love this dumps, update quickly and content completely. it is enough for my exam. Recommend.


Zoubesh

  • Belgium
  • Sep 25, 2023
  • Rating: 4.5 / 5.0

This is very good dumps with almost 100% correct answers, much better than any other dumps. Recommend.


Quentin

  • United States
  • Sep 24, 2023
  • Rating: 4.4 / 5.0

Very good {sku} dumps, take full use of it, you will pass the exam just like me.


Vic

  • Sri Lanka
  • Sep 22, 2023
  • Rating: 4.6 / 5.0

Great job, you guys. I passed my exam with your help! Thanks for everything!


Carlos

  • United Kingdom
  • Sep 22, 2023
  • Rating: 4.9 / 5.0

I purchased the dumps one month ago and I learned a lot from the dumps. I will attend the exam tomorrow, I feel very confident now. Good luck to me.


Omar

  • Netherlands
  • Sep 22, 2023
  • Rating: 4.2 / 5.0

Thanks for your help. I passed my exam yesterday with the full points! Great job.


Ned

  • Spain
  • Sep 22, 2023
  • Rating: 4.1 / 5.0

Passed full scored. I should let you know. The {sku} exam dump is very good, valid and accurate.


Tony

  • United States
  • Sep 22, 2023
  • Rating: 4.8 / 5.0

yes, i passed the exam in the morning, thanks for this study material. Recommend.


Dwight

  • Hungary
  • Sep 20, 2023
  • Rating: 4.3 / 5.0

Very useful study material, thanks the help of this dumps .


Download Free ISQI CTAL-TM_SYLL2012 Demo

Experience Certbus exam material in PDF version.
Simply submit your e-mail address below to get started with our PDF real exam demo of your ISQI CTAL-TM_SYLL2012 exam.

Instant download
Latest update demo according to real exam

*Email Address

* Our demo shows only a few questions from your selected exam for evaluating purposes