OG0-093 Dumps

  Printable PDF

  Unencrypted VCE

The Open Group OG0-093 dumps - 100% Pass Guarantee!

Rating: 5.0

Vendor: The Open Group

Certifications: The Open Group Certification

Exam Name: TOGAF 9 Combined Part 1 and Part 2

Exam Code: OG0-093

Total Questions: 365 Q&As ( View Details)

Last Updated: Mar 26, 2024

Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $45.99 VCE Only: $49.99 VCE + PDF: $59.99

PDF

  • Q&As Identical to the VCE Product
  • Windows, Mac, Linux, Mobile Phone
  • Printable PDF without Watermark
  • Instant Download Access
  • Download Free PDF Demo
  • Includes 365 Days of Free Updates

VCE

  • Q&As Identical to the PDF Product
  • Windows Only
  • Simulates a Real Exam Environment
  • Review Test History and Performance
  • Instant Download Access
  • Includes 365 Days of Free Updates

The Open Group OG0-093 Last Month Results

546
Successful Stories of The Open Group OG0-093 Exam
97.1%
High Score Rate in Actual The Open Group Exams
94.6%
Same Questions from the Latest Real Exam
  • 97.1% Pass Rate
  • 365 Days Free Update
  • Verified By Professional IT Experts
  • 24/7 Live Support
  • Instant Download PDF&VCE
  • 3 Days Preparation Before Test
  • 18 Years Experience
  • 6000+ IT Exam Dumps
  • 100% Safe Shopping Experience

OG0-093 Q&A's Detail

Exam Code: OG0-093
Total Questions: 365
Single & Multiple Choice 365

OG0-093 Online Practice Questions and Answers

Questions 1

Which one of the following is NOT an element of an architecture framework?

A. A common vocabulary

B. A list of recommended standards

C. A method for designing an information system in terms of building blocks

D. A set of structures which can be used to develop a broad range of architectures

E. A system development lifecycle method for software engineering

Show Answer
Questions 2

Scenario: Please read this scenario prior to answering the Question You are serving as the Lead Enterprise Architect at a major supplier in the automotive industry. The company is headquartered in Cleveland, Ohio with manufacturing plants across the United States, Brazil, Germany, Japan and South Korea. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.

The company is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.

The Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.

At a recent meeting, the Architecture Board approved a Request for Architecture Work sponsored by the Chief Engineer of Global Manufacturing Operations. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.

The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of diving their planning and production scheduling from a remote centralized system. The Chief Engineer wants to know how these concerns can be addressed.

Refer to the Scenario During the initial meeting of the Common ERP Deployment architecture project team, a number of alternative recommendations for how to proceed are put forward by members of the team. You have been asked to select the most appropriate recommendation to ensure that the team evaluates different approaches to the problem and clarifies the requirements for the architecture. Based on TOGAF 9, which of the following is the best answer?

A. The team should develop Baseline and Target Architectures for each of the manufacturing plants, ensuring that the views corresponding to selected viewpoints address key concerns of the stakeholders. A consolidated gap analysis between the architectures will then be used to validate the approach, and determine the capability increments needed to achieve the target state.

B. The team should exercise due diligence and carefully research vendor literature and conduct a series of briefings with vendors that are on the current approved supplier list. Based on the findings from the research, the team should define a preliminary Architecture Vision. The team should then use that model to build consensus among the key stakeholders.

C. The team should use stakeholder analysis to understand who has concerns about the initiative. The team should then hold a series of interviews at each of the manufacturing plants using the business scenario technique. This will then enable them to identify and document the key high-level stakeholder requirements for the architecture.

D. The team should conduct a pilot project that will enable vendors on the short list to demonstrate potential solutions that will address the concerns of the stakeholders. Based on the findings of that pilot project, a complete set of retirements will be developed that will drive the evolution of the architecture.

Show Answer
Questions 3

Complete the sentence. The Architecture Board is typically responsible and accountable for achieving all of the following goals except ___________

A. ensuring consistency between sub-architectures

B. approving the strategic business plans proposed by individual organization units within the enterprise

C. enforcement of architecture compliance

D. identifying and approving components for reuse

E. providing the basis for all decision-making with regard to changes to the architecture

Show Answer
Questions 4

Which one of the following best describes a primary use of the Architecture Vision document?

A. A checklist for compliance reviews

B. An evaluation tool to select vendors to conduct a proof of concept demonstration

C. A tool for calculating detailed cost estimates

D. A tool for project planning the implementation activities ActualTests.com

E. A tool for selling the benefits of the proposed capability to stakeholders

Show Answer
Questions 5

Which of the following describes the TOGAF Technical Reference Model?

A. A Common Systems Architecture

B. A Foundation Architecture

C. An Industry-Specific Architecture

D. An Organization-Specific Architecture

E. A Solution Architecture

Show Answer More Questions

Add Comments

Comment will be moderated and published within 1-4 hours

Success Stories

  • Poland
  • Butt
  • Mar 23, 2024
  • Rating: 5.0 / 5.0

Absolutely valid. i passed today. You are the best. Thanks so much.


  • Poland
  • Lex
  • Mar 21, 2024
  • Rating: 4.8 / 5.0

All the questions I had on the exam were in this OG0-093 dumps. I just passed my exam yesterday. Full scored. Thanks very much for your help.


  • Denmark
  • Zwe Thu Ko
  • Mar 21, 2024
  • Rating: 4.6 / 5.0

Their dumps is a very recent update. All the new questions are there! Recommend.


  • Philippines
  • Tax
  • Mar 20, 2024
  • Rating: 4.8 / 5.0

Today i pass the exam successfully .Thanks for this dumps. Recommend.


  • Jordan
  • Zard
  • Mar 20, 2024
  • Rating: 4.4 / 5.0

This file is so much valid, I passed the OG0-093 exam successfully. thanks for my friend introduce this dumps to me.


  • South Africa
  • Mickey
  • Mar 19, 2024
  • Rating: 4.3 / 5.0

A very good study material, i just used one month and i passed the exam yesterday. So you can trust on it.


  • Morocco
  • souam
  • Mar 19, 2024
  • Rating: 4.9 / 5.0

There are many new questions in the dumps and the answers are accurate and correct. I finished my exam with high score this morning, thanks very much.


  • United States
  • Zouleha
  • Mar 19, 2024
  • Rating: 5.0 / 5.0

Update quickly and be rich in content,this dumps is really valid. Thanks.


  • Hungary
  • Dwight
  • Mar 19, 2024
  • Rating: 4.3 / 5.0

Very useful study material, thanks the help of this dumps .


  • Israel
  • Zuzi
  • Mar 19, 2024
  • Rating: 4.2 / 5.0

i'm so happy that i passed the exam with full score, thanks for this dumps, thanks all.

The Open Group OG0-093 exam official information: Exam Name: TOGAF 9 Combined Part 1 and Part 2 Qualification upon passing: TOGAF 9 Certified Delivered at: Authorized Examination Provider Test Centers, and via Online Proctored