Vendor: EMC
Certifications: EMC Certification
Exam Name: Technology Architect Backup and Recovery Solutions Design Exam
Exam Code: E20-329
Total Questions: 326 Q&As ( View Details)
Last Updated: Apr 13, 2024
Note: Product instant download. Please sign in and click My account to download your product.
VCE
EMC E20-329 Last Month Results
E20-329 Q&A's Detail
Exam Code: | E20-329 |
Total Questions: | 326 |
Single & Multiple Choice | 326 |
CertBus Has the Latest E20-329 Exam Dumps in Both PDF and VCE Format
E20-329 Online Practice Questions and Answers
An EMC Avamar customer has a 750 GB Oracle server and a file server to back up. What is a consideration when designing an Avamar Virtual Edition (AVE) solution?
A. Average size of the file system and the database.
B. Ratio between the largest file and the largest tablespace.
C. Ratio between the size of the file system and the database.
D. Average size of the largest file and the largest tablespace.
A customer wants to deploy encryption-at-rest for Avamar. When sizing a new solution, which key encryption-at-rest factor(s) should be considered?
A. Consumes more system resources
B. Does not require significant system resources
C. Consumes more resources and requires 35% more disk capacity
D. Requires 50% more disk capacity
Refer to Scenario .
A customer is looking to modernize their backup infrastructure. The current environment consists of a
single centralized data center and several remote sites. The centralized data center hosts all core services
and applications. The remote office primarily consists of sales personnel with 4000 use-North America,
500 in Europe, and 300 in Asia using file servers.
The current backup environment at the primary site uses CommVault backing up to a Fibre Channel tape
library that contains four ITO-4 tape drives. Currently they are backing up a number of file servers as well
as several databases that have average change rates of 7% daily Remote office backups are currently
performed by having users copy files to regional file servers that are then backed up to tape.
In the past few months, the customer has experienced problems with getting backups to finish within their
defined windows as well as issues with the tape library hardware. They now have concerns about gaps in
their backup coverage as well as the reliability of the tape media. In addition, an internal audit shows a
large amount of user-generated data is unprotected on remote user laptops.
The customer is looking for a common platform to standardize their backups. They want a solution which
allows for a centralized infrastructure so -they do not need to rely on remote resources to address
hardware and software issues. The other goal is to move away from tape to a more reliable disk-based
solution.
The customer is evaluating EMC Avamar as a possible solution to backup their remote users. They are
estimating that each machine will take approximately 10 minutes to backup. They would like all backups to
complete in 8 hours.
What is the minimum number of storage nodes needed to support the necessary connections to complete
the backups of the North American system in the defined window?
A. 3
B. 4
C. 5
D. 6
You are assigned to upgrade an existing EMC NetWorker server. You ask the customer to run the nsrlic v
servername command and send you the output.
What information is received?
A. Available licenses by type and client
B. Available licenses by type and expiration date
C. Number of licenses by client only
D. Number of unassigned licenses
A customer wants to back up 45,000 desktops/laptops across 38 remote sites worldwide. They want a solution using deduplication at the source client.
The customer currently has three large data centers that will be performing backups of 8500 servers per data center. Additionally, all backups must be replicated to a single disaster recovery (DR) site. Their current environment uses tape for backup. The Chief Information Officer (CIO) requires that the tape be used at the disaster recovery site so that they stay compliant with their 10 year regulations. The customer must also use encryption at rest.
Which solution meets these requirements?
A. Avamar and AVE at the remote offices; Avamar Extended Retention at the DR site
B. Data Domain, Replication Manager, and Avamar Extended Retention at the DR site
C. NetWorker, Recovery Manager, AVE, and Avamar Extended Retention at the DR site
D. AVE, SnapImage, Data Domain, and Networker at the DR site
Add Comments
Already passed my E20-329 exam. Valid dumps. Good site. Thanks, guys.
Absolutely valid. i passed today. You are the best. Thanks so much.
Yesterday, I passed the exam with unexpected score with the help of this dumps. Thanks for this dumps.Recommend strongly.
This dumps is very good, and i have passed the exam with the help of it recently.
This is the best study material I have used ,and I will continue using it when I have exam. Believe me,you can trust on it.
Nice study material, I passed the exam with the help of it. Recommend strongly.
This dumps is helpful and convenient, you can trust on it .Good luck to you.
Passed the E20-329 exam with an unexpected score. A big surprise. Thanks very much.
A very helpful study material, I have passed the exam with the help of this dumps. So i will introduce this dumps to other friend.
i cannot image that i would pass the exam with so high score, thanks for this dumps. Recommend.